Information
-
Conducted on
-
Prepared by
-
Location
-
TD begin
Information
-
Technical Ryder handed out.
-
Technical Run-sheets Handed Out
-
Group Meeting - As soon as everyone arrives
-
Draw any diagrams needed
-
Notes
Comms Allocation + Radio Test
-
Following Positions Allocated Comms
- Technical Director /
- Hall 1 Stage Manager /
- Hall 2 Stage Manager /
- Hall 1 Sound Engineer /
- Hall 2 Sound engineer /
- Hall 1 Control Room /
- Hall 2 Control Room /
- Hall 1 Service Director /
- Hall 2 Service Director /
- Evens Manager /
- Lighting Manager trainee Technical Director
-
All Comms Tested
-
All Comms Confirmed Working
Hall 1 - Auditorium
-
Stage Set Up Complete<br>
-
Audio Line Checked
-
Video Line Checked
-
Lighting Line Checked
-
Screens Line Checked
-
Notes
Hall 2 - Chapel
-
Stage Set Up Complete
-
Audio Line Checked
-
Video Line Checked
-
Lighting Line Checked
-
Screens Line Checked
-
Notes
Crèche
-
Video Link Working
-
Audio Link Working
-
Notes
Hall Link
-
Video Link Working
-
Audio Link Working
-
Notes
Completion Of Set Up and Testing - 7:45AM
-
Both services 100% Set Up
-
Both Stages clear and ready for worship band sound check
-
Meeting with all tech people on this morning complete.
-
Time in which all was complete
-
Signature of completion - Set Up
-
Notes
Sound Checks
-
Sound Check On Time ( Hall 1 )
-
Sound Check On Time ( Hall 2 )
-
Notes
Pre-Service Meeting
-
All Required Positions Attended
-
Run Sheet Stayed The Same
-
Worship Set Stayed The Same
-
Notes
10 AM Service
-
Service Start
-
Mix Good - Both Halls
-
All lyrics correct, and all timing perfect
-
Worship Finish
-
Pulpits moved on time, to correct places
-
Mic rotations clear, and successful as per the technical Ryder
-
Notices Start Hall 1
-
Notices Start Hall 2
Connect Time
-
* TD TO COMMS EACH POSITION TO CONFIRM WORKING*
-
All positions confirmed working
-
All clear to proceed
10 AM Service completed
-
Message Start Hall 1
-
Message Start hall 2
-
Video working Hall 1
-
Video Working Hall 1
-
Video Link Confirmed Working
-
Picture Of Video Link
-
Notes
Post Service
-
Sound 100%
-
Screens 100%
-
Lighting 100%
-
Stage Management and execution 100%
-
Camera and Visual Link 100%
-
Timing 100%
Recording
-
Message Uploaded
Pack down
-
Both halls packed down
-
All necessary things shut off
-
All secure areas secure
-
TD SIGN OFF - SERVICE COMPLETE
-
Time Of Sign Off
-
Location Of Sign Off