Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Telstra - Small Site Cooling.
Pre-Work Photo's
-
Internal overview photo's of the hut
-
Photo's of the existing switchboard
-
Photo's of the existing environmetal controller (PLC) - if installed
-
Photo's of each air- conditioner onsite
Post Work Photo's
-
Internal overview photo's of the hut. Work completed
-
Photo's of the switchboard showing where the new air-conditioner is supplied from
-
Photo's of the cooling controller. Capture an overview of the install as well as close up photo's showing labels
-
Photo's of PLC screen showing settings.
-
Photos of new Power Relay enclosure. Capture and overview of the install as well as close up photo's showing labels - If required.
-
Photo's of each air- conditioner with new extra low voltage wiring control and/or controller
-
Are all air- conditioner units operational
-
Photo of sketched overhead room layout
General photos
-
Overview photo's of the compound
-
Overview photo's of each external wall of the SCAX Hut
Security/ Safety Concerns
-
Are there any security or safety issues on site?
-
Appendix