Information
-
Document No.
-
Airbus Broughton
Hydrant Test & Inspection
Fire Hydrant Information
-
Select the area that the fire hydrant is located, then select the fire hyrant No. from list. (Refer to Hydrant drawings for locations)
-
Location on site;
-
East site; Enter Hydrant No.
- H001
- H002
- H003
- H004
- H005
- H006
- H007
- H008
- H008A
- H009
- H010
- H011
- H012
- H013
- H049
- H050A
- H050B
- H051
- H052
- H053
- H054
- H055
- H056
- H057
- H057A
- H058
- H059
- H060
- H060A
- H063
- H064
- H065
- H065A
- H066
- H067
- H068
- H069
- H070
-
North Factory Area; Enter Hydrant No.
- H014
- H015
- H016
- H017
- H027
- H027A
- H029A
- H032
- H033
- H034
- H035
- H035A
- H039
- H045
- H046
- H046A
- H058
- H059
- H061
- H062
- H112
- H113
- H114
- H115
- H116
- H117
- H118
- H028
- H029
- H031
- H032
-
West site; Enter Hydrant No.
- H001-W
- H002-W
- H003-W
- H004-W
- H005-W
- H006-W
- H007-W
- H008-W
- H009-W
- H010-W
- H011-W
- H012-W
- H013-W
- HO14-W
- H015-W
- H016-W
- H017-W
- H018-W
- H019-W
- H046
-
Site 3 Area; Enter Hydrant No.
- H014
- H015
- H016
- H017
- H027
- H027A
- H029A
- H032
- H033
- H034
- H035
- H035A
- H039
- H045
- H046
- H046A
- H058
- H059
- H061
- H062
- H112
- H113
- H114
- H115
- H116
- H117
- H118
- H028
- H029
- H031
- H032
-
Site 8 Area; Enter hydrant No.
- H001
- H002
- H003
- H004
- H005
- H006
- H007
- H008
- H008A
- H009
- H010
- H011
- H012
- H013
- H049
- H050A
- H050B
- H051
- H052
- H053
- H054
- H055
- H056
- H057
- H057A
- H058
- H059
- H060
- H060A
- H063
- H064
- H065
- H065A
- H066
- H067
- H068
- H069
- H070
-
Add details
Test Procedure
-
Confirm that all steps of test and inspection procedure has been undertaken.
-
All personnel to wear PPE appropriate to the task and surrounding conditions.
-
Remove the hydrant lid/lids utilising the key and bar
-
A standpipe should be fitted to the outlet to ensure that the thread or connection is in good order.
-
With the standpipe connected to the outlet, the valve should be partially opened to release a small quantity of the water through the hydrant via a key and bar placed on the hydrant spindle.
-
The flow of water should be directed into the gutter using a short hose
-
After closing the hydrant fully, insert a hand controlled branch into the standpipe or hydrant outlet.
-
Ensuring the branch closed, open the hydrant to it's fullest extent.
-
Whilst under pressure, examine all hydrant joints for leaks.
-
The hydrant can then be turned off, release the pressure by opening the branch then remove the branch then unship the standpipe.
-
The frost valve where fitted should be checked to ensure it is in a satisfactory working order (NB; this test should not be carried out during frosty weather.)
-
Replace the hydrant lid, ensuring a sound fit and the lid does not stand proud of the lid frame.
-
Crews to ensure area immediately surrounding the hydrant is free from debris, long grass or foliage and hydrant post and plate is clearly marked.
Issues / Actions Raised.
-
Record any obvious signs of damage, defects, or issues etc. Include photos where relevant.
-
Any Observations / Comments?
-
Enter details
-
Add Photo
Test & Inspection undertaken by;
-
Enter date of inspection, Watch, and all RFFS personnel who have carried out test procedure.
-
Select date
-
Test undertaken by;
-
RFFS personnel;
- WM S Bradley
- CM K Frost
- CM C Bowen
- FF H Jones
- FF D Jones
- FF P Stafford
- FF J Hodgkinson
- FF C Brooks
- FF J Taaffe
- FF M Thomas
- FF J Haye
-
RFFS Personnel;
- WM A Hollinghurst
- CM A Williams
- CM S Lane
- FF L Lewis
- FF T Williamson
- FF D Tunner
- FF S Miller
- FF G Cooper
- FF C Holden
- FF M Jones
- FF J Wells
-
RFFS personnel
- WM MJones
- CM L Owen
- CM S Weatherhead
- FF C Morgan
- FF J Grovsner
- FF R Clayton
- FF D Povey
- FF C Graydon
- FF A Hayes
- FF A Bright
-
RFFS Personnel
- WM D Jones
- CM J Williams
- CM B Profit
- CM N May
- FF M Buckley
- FF G Morgan
- FF T Pye
- FF H D Jones
- FF R Wright
- FF A Bolton
- FF L Williams
- FF J Berry
-
Add signature
-
RFFS Personnel; additional
-
RFFS Personnel;
- WM S Bradley
- CM K Frost
- CM C Bowen
- FF H Jones
- FF D Jones
- FF P Stafford
- FF J Hodgkinson
- FF C Brooks
- FF J Taaffe
- FF M Thomas
- FF J Haye
-
RFFS personnel;
- WM D Jones
- CM J Williams
- CM B Profit
- CM N May
- FF M Buckley
- FF G Morgan
- FF T Pye
- FF H D Jones
- FF R Wright
- FF A Bolton
- FF L Williams
- FF J Berry
-
RFFS Personnel;
- WM A Hollinghurst
- CM A Williams
- CM S Lane
- FF L Lewis
- FF T Williamson
- FF D Tunner
- FF S Miller
- FF G Cooper
- FF C Holden
- FF M Jones
- FF J Wells
-
RFFS Personnel;
- WM MJones
- CM L Owen
- CM S Weatherhead
- FF C Morgan
- FF J Grovsner
- FF R Clayton
- FF D Povey
- FF C Graydon
- FF A Hayes
- FF A Bright
-
Ensure all details are correct. Report any defects to Facilities Helpdesk. Email the completed audit to B. Ackerly