Title Page
-
Site conducted
-
Composter model
-
Conducted on
-
Prepared by
-
Location
Inpection
-
Check heating rods and heating oil
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Check electrical connections for the ventilation fan
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Check electrical connections for main disconnect connection
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Check electrical connections for main motor
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Check all indicators and LCD bulbs, emergency stop, and magnetic and proximity sensors
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Tighten all control panel wiring screw connections
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Perform and inspect full waste input cycle and offload procedure
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Check tote lifter hydraulic systems
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Check and tighten all nuts on paddle arms; remove any items wrapped around the shaft arm
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Grease main bearing on both ends of the main shaft
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Inspect gear drive oil levels
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Check ventilation filter, internal fan filter, and ventilation hose for blockage
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Check Deodorizer for leaks and filter blockages, clean/drain cartridges
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Check and, If necessary, reconfigure settings for heating pad thermocouples, internal tank temperature and humidity setting
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Review logs and diagnostic history, including events and alarms
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Check tote lifter batteries
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Visually inspect for loose or frayed wiring
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Inspect the machine for cleanliness
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Check for any leaks or moisture in the area
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Check for plastic in machine
- Pass
- Fail - fixed during inspection
- Fail - follow up visit required
-
Add any additional recommendations from the inspection
-
Add any details of any additional work carried out whilst on site for the preventative maintenance
Sign off
-
Sign to confirm the inspection has been completed