Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1. SITE and DOCUMENTATION

Authority

1.1 Authority Certificates/Licences

  • b.     EWP licence

  • c.      Western Power authorised contractor signage displayed

  • d.     First aid ticket available and in date

  • e.      Construction Industry Safety card/certificate

1.2 Pre Job Planning

  • a.     Has Tailgate been conducted & documented

  • b.     Have all personnel who are involved in carrying out the task signed the JSA

  • c.      Has JSA form been filled out correctly

  • d.     Have all hazards been identified and controlled

  • e. Western Power Distribution Construction Handbook available and up to date (Reference HB1-2007)

  • f.      Western Power Safety manual available

2. SAFETY EQUIPMENT AND SITE SET-UP

2.1 RTC Worksite Management

  • a.      Road signs used to alert traffic of works in progress

  • b.     Correct road signs/cones used

  • c.      Flashing arrows used on vehicles working on road ways

  • d.     Reflective vests or hi viz clothing worn by personnel working in road reserve

  • e.      Traffic management personnel hold current authorisation for tasks that are being carried out

  • f.      Traffic Controllers Handbook available on site

  • g.     Traffic management personnel complying with Western Power PPE requirements

  • h.     Worksite barriers and warning signs in place

2.2 Work Gloves

  • a.      Are HV/LV gloves stored correctly when not in use. Not inside out

  • b.     Correct gloves used for the task being performed

  • c.      LV/HV gloves in test date

  • d.     Are correct gloves worn for switching

2.3 Eye Protection

  • a.      Approved safety glasses worn when working on site

2.4 Safety Helmets

  • a.      Helmet has name and replacement date inside

  • b.     Worn on work site

2.5 Worksite Clothing

  • a.      Approved overalls/long sleeve shirt & trousers worn.

  • b.     Sleeves rolled down, buttoned at cuffs and neck area when on Western Power site

  • c.      Approved safety footwear worn

  • d.     Fall arrest harness displaying current inspection tag.

2.6 Pole Top Rescue Kit

  • a.      PTR kit used when working on or near live/de-energised LV conductors & positioned accordingly and inspected.

  • b.     Observer on ground monitoring person working on live/de-energised LV

2.7 Use of Mobile Phones

  • a.      Mobile phones NOT being used at the pole top

  • b.     Mobile phones NOT being used when operating machinery

  • c.      Mobile phones NOT being used when performing safety observer duties on live LV/HV

2.8 Use & Maintenance of Ladders

  • a.     Are all ladders tied in when working on live/de-energised conductors

  • b.     Are ladders mechanically stabilised or footed when ascending or descending

  • c.      Are ladders in serviceable condition and have a current inspection tag attached

2.9 House Keeping

  • a.      Work vehicle clean tidy and hazard free

  • b.     Fuel stored correctly not near gloves and sleaves

  • c.      Correct number and type of fire extinguishers on the vehicles (extinguishers within test date)

  • d.     Electrical cords/equipment displaying current test tag

  • e.      All chains and slings displaying SWL tag and in good condition

  • f.      All live working tools and equipment within test date including earths

  • g.     Are gas bottles stored correctly and hoses in good condition

  • h.     Vehicle logbooks in vehicle and kept up to date

3. CIVIL CONSTRUCTION

3.1 Removal of Poles

  • a.      Has hardware been removed from pole if is it logged as a risk on the JSA

  • b.     Correct pulling method applied

  • c.      Is the pole completely exposed if pole is to be removed by crane

3.2 Erection of Conductive poles Through Live Line

  • a.      Is a Safety Observer present

  • b.     Are conductors covered & stabilised if the LV/HV is live

  • c.      Are the pole and crane earthed during pole installation if LV/HV is live

  • d.     Pole top shroud fitted if HV is live

3.3 Handling of Treated poles

  • a.      Are dusk masks worn if risk of breathing sawdust from treated poles

  • b.     Are poles extracted from the ground that show signs of leeching wrapped in plastic sheeting

3.4 Excavation Work

  • a.      Safety observer present if work in trench is more than 1.5m in depth

  • b.     Excavation areas temporarily barricaded

  • c.      Excavation shored up where required

3.5 Working Adjacent to Gas Mains

  • a.      Minimum separation distance of 500mm untouched soil between any new structure and gas main

  • b.     Are relevant one call plans available, in date and for the correct work area

  • c.      Gas authority notified of intended work adjacent to gas mains in Albany and the Vines

  • d.     If working within 15M of high pressure gas main has Alinta been notified and is there an accredited locator on site

4. WORKING AT HEIGHTS

4.1 Working From EWP

  • a.     Operator/s in EWP conforming to approved procedures and tickets valid (EWP and EDD)

  • b.     Approved safety harness worn correctly

  • c.      EWP earthed when working in regulated area

  • d.     EWP displaying current electrical test sticker or certificate

  • e.      Ground observer present when working dead

  • f.      SWL of the basket not exceeded

  • g.     Operators inside the bucket with at least one foot on the basket floor

  • h.     If operators are travelling in basket are they complying with FI 2.10.6.4

4.2 Climbing & Inspecting Poles

  • a.      Has initial visual pole inspection been carried out? Including hardware, conductors and adjacent structures

  • b.     Is pole to be climbed supported/reinforced.

  • c.      Have correct safety checks been made prior to climbing/lowering off conductors on steel service pole

  • d.     EWP used to access 150mm x 150mm wood carry over pole

  • e.      Is the pole supported 4 ways if treated and over 10 years old (if not reinforced)

  • f.      Is pole supported 4 ways if untreated and over 5 years old (if not reinforced)

5. LINE WORK

5.1 Line Work On Or Close To Live/De-Energised Conductors

  • a.      Line sleeve/covers used to cover conductors during pole top work

  • b.     Line sleeve used to cover bare s/l wire while working on live/de-energised conductors

  • c.      Are approve methods used when temporarily supporting LIVE LV conductors

  • d.     Safety observer present during all live/de-energised work

5.2 Dead LV Requirements

  • a.      Personnel working between shorting out leads, all phases shorted out to neutral including streetlight

  • b.     Shorting out leads in good condition

  • c.      Disio’s barriered if working on the same pole (one side live)

  • d.     Are Disio’s out side the work area and all points of isolation fitted with danger labels

  • e. All personnel signed on/off the (EAP) Electrical Access Permit

5.3 LV Aerial Bundled Cable

  • a.      Are Dynamometers used in conjunction with sag charts and thermometer to tension ABC

  • b.     Is radio contact between cable drum winch and observer’s constant during the stringing of ABC

  • c.      Has temporary out of balance stay been applied where ABC meets existing conductor to counter act different loading

  • d.     Are correct procedures being used when less than 4 turns remain on the drum

5.4 Stringing and Tensioning Conductors

  • a.      Mains de-energised or made dead during stringing and tensioning> 1 bay of LV below HV conductors

  • b.     Mains de-energised or made dead during HV stringing and tensioning over LV conductors

  • c.      Mains de-energised or made dead during re regulating >1 bay of LV or HV under or over live conductors either side of work position

5.5 HV Live Line/G&B Techniques

  • a.      Live Line tools/equipment within test date

  • b.     Insulating barriers within test date

  • c.      Safety observer appointed and watching when crew are in the contact area

  • d.     VA issued and all signed on/off

  • e. Correct voltage recorded on (VA) Vicinity Access

  • f.      Correct class of gloves/covers used for voltage (e.g. class4 for 33KV and class3 up to 22KV)

  • g.     HV and LV insulating barriers installed as required

  • h.     Conductor loading calculated

  • i.       EWP boom wiped down and bucket clean

  • j.       EWP/Plant Earthed correctly and earth lead in test date

  • k.     Minimum approach distances maintained at all times

  • l.       Conductor controlled at all times

  • m.    Communication between all team members clear and precise

  • n.     Correct tools and equipment used for task

  • o.     Min of 150mm maintained from LV if no HV covers applied

  • p.     No one accesses the EWP whilst crew in the contact area

  • q.     Work site/EWP barriered off

6. UNDERGROUND WORK

6.1 LV Cable Work (UDS)

  • a.      Cable identified prior to jointing by approved methods and ends marked accordingly

  • b.     Working ends of cables made off and placed in mini pillars with lids painted white and labelled correctly

  • c.      Approved “DANGER” labels fitted to UDS cabled advising other end not to be terminated

  • d.     Live bus bars in kiosk either side of work position covered during LV work

  • e.      Are distribution feeder cables labelled (inc. Next interconnection point) in transformer kiosk

  • f.      Cables entering UDS uni pillars correctly positioned (left side/right side)

6.2 Commissioning Procedure (UDS)

  • a.      Working ends of cables made off and placed in mini pillars with lids painted white

  • b.     Have new cable had an insulation resistance test before energising

  • c.      Drawings checked ensuring cables feeding into another scheme cannot be energised

  • d.     All cable ends terminated within the UDS scheme

7. SERVICE COMMISSIONING AND TESTING

7.1 Service Cable and Meter Testing

  • a. Service cable de-energised prior to removal or reconnection of MCB (Field reference instruction FI 5.1- FI5.2)

  • b.     Three man crew for service connections

  • c.      Two men carrying out meter testing and both authorised

  • d.     Meter testing procedure followed as per Service Connection Testing Form

  • e.      Service connection test form been completed (2 signatures)

  • f.      Meters and fuses sealed on completion of testing

  • g.     Independent earth used when testing

  • h.     Are customers with ineffective earth notified, disconnected and issued fault notice

  • i.       Authorised safety observer present when re-connecting service cable

  • j.       Neutral tag fitted to LV conductor

8. SWITCHING

8.1 Switching & Permits

  • a.     All personnel involved in work associated with switching programme individually signed on/off the EAP, VA or sanction to test

  • b.     Are personnel working on overhead conductors boxed in by portable earths

  • c.      Points of isolation danger labelled

  • d.     Is equipotential mat used correctly when operating PTS

  • e.      Have all possible point of supply been disconnected

  • f.      Switching a Authorised level (Western Power only)

9. SPRAY WASHING AND SILICON

  • a.        Bare hand stick techniques used

  • b.        Safety clearances adhered to

  • c.        All tools and equipment in test date

  • d.        Has water been tested before washing with calibrated tester

  • e.        EWP earthed

  • f. (VA) Vicinity Access issued and all signed on/off

  • g.        Water pressure correct (min 5600kpa – max 14000kpa)

  • h.        LV covers fitted when spraying HV

  • i.         Current authorisation for spraying

10. PEOPLE AND BEHAVIOURS (ACTIVE 8 OBSERVATIONS)

  • Sign off by person controlling the workplace ?

  • Are employees maintaining Eyes on Path whilst moving around the worksite ?

  • Are employees Looking Before Moving ?

  • Are employees selecting appropriate Tools and Equipment and wearing correct PPE ?

  • Are employees keeping Eyes on Hands whilst doing works which could result in injury ?

  • Are employees ensuring they are not placing themselves in Line of Fire ?

  • Are employees Communicating their intent to others ?

  • Are employees using correct manual handling techniques to maintain correct Position and Effort ?

11. POSITIVE OBSERVATIONS

  • Note Positive Observations

12. AT RISK OBSERVATIONS IF IDENTIFIED

  • Note at Risk Observations

  • Provide a sketch of the area of concern if applicable to support findings

  • Provide a sketch of the area of concern if applicable to support findings

13. SIGN OFF AT COMPLETION OF SITE VISIT

  • Sign off by person controlling the workplace

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.