Title Page
-
SDO
-
Prepared by (engineers name)
-
Team
- BC1
- BC2
- NB1
- NB2
- NB3
- NB4
- NB5
-
Date
Details
-
New chamber requirement
- JUF4
- JUF6
- JUF2
- JUF10
- M/H
- JRC12 (C/W 2 Lids)
- JRC14 (C/W 3 Lids)
- CW1 (C/W Manhole)
- Pole Up Turn
- Locked Chamber
-
New Chamber ID Reference
-
Fibre Pack Name
-
Location
-
Existing BT chamber type
- JUF4
- JUF6
- JUF2
- JUF10
- M/H
- JRC12 (C/W 2 Lids)
- JRC14 (C/W 3 Lids)
- CW1 (C/W Manhole)
- Pole Up Turn
- Locked Chamber
-
Chamber condition
-
Image of BT Chamber ONE LID CLOSED, TWO SURROUNDING , ONE INTERNAL
-
BT Annotation of Chamber Location
-
Is this chamber being built as per fibre pack proposal?
-
BT Annotation of changes to location
-
Google Annotated Overview
-
Surface Type
- Footway (Tarmac)
- Footway (Slabs)
- Footway (Concrete)
- Carriageway (Tarmac)
- Carriageway (Slabs)
- Carriageway (Concrete)
- Soft Verge
-
Can 1.2m be maintained on the footway?
-
Will there be carriageway incursion required?
-
What is the speed limit of the road?
-
What TM is recommended?
-
Any site specific risks / hazards to raise?
Sign-Off
-
Tick to submit chamber survey
-
Engineer Sign-off