Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

ITEMS BELOW ARE TO BE COMPLETED DAILY

General Audit Details

  • Date / Time

  • Tile Profile

  • Colour

  • If other, please specify

  • Batch Number

  • Kiln Car Number

  • Photo of kiln car facing south

Colour Variation

  • Tile Sampling Plan

  • Photo of lay up as per Kiln car sample plan

  • Was there any colour variation

  • If yes, was it within an acceptable tollerance

Tile Surface

  • Were there any surface blemishes present

  • Photos of any surface blemishes present

  • Were the touch points acceptable

  • Photo of touch points

Batch Notes

  • Any product down grade required

  • Comments

Audit Attendees

  • Production Manager

  • Production Leading Hand

  • Sales

  • Other

  • Other

ITEMS BELOW TO BE COMPLETED WEEKLY

Tile Weights

  • Average Weight for Sample (kg)

Strength Test

  • Average Exposed width (mm)

  • Average Break load for Sample (kg)

  • Average AS strength - N/exp mm

  • Australian Standard - All tiles above 4 N / exposed mm

Water Absorbtion

  • Average Water absorption %

  • Australian Standard - All tiles below 10% water absorbtion

Data Collection

  • Data Source

Batch notes

  • Comments

  • Any Downgrade required

  • Tiles pass Australian Standards and sample is accepted

  • Person completing tile testing

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.