Title Page

  • Client / Site

  • Block and Town house no.

  • Prepared by

Pre-start Tiling

  • Prestart Tiling works checks completed by

  • Date of completion

Pre-start checklist Bathroom shower area

Plumbing

  • Is the Allproof flange glued 25mm below the surface of the concrete floor?

  • Is the brass rose extension in place?

Substrates

Shower walls

  • Is the Gib Aqualine straight within the tolerances?

  • Are the screws in the Gib Aqualine at a maximum of100mm spacings?

  • Are the screws and sheet joints plastered?

Bathroom floor

  • Is the shower base rebate a minimum of 1025mm x 1025mm?

  • Is the concrete floor straight and within the tolerances?

  • Is the concrete floor free from cracks?

  • Is there a UFH draw wire cable present?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.