Main Page of Site Returns
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Site Returns Index Page
-
Please select which Inspections you are completing.
- Labour Returns
- Site Supervisor Safety Inspection
- Site Diaries
- Toolbox Talks
- Progress Report
- LOLER
- PUWER
- MEWPS (Scissors & Cherry Pickers)
- MCWP (Mast Climbers)
- Operated Daily Inspection
- Vibrations Exposure Report
- Lifting Operations Checklist
- Images of Site
- Manager Site Visit Report
- GRAHAMS Daily Activity Briefing
Site Supervisor Safety Inspection Report Form (Weekly)
-
Site:
-
Inspection Carried Out By:
-
Week Commencing:
SSSI - Comments
-
Supervisors Comments - Edge Protection & Scaffolding
-
Supervisors Comments - Working at Height
-
Supervisors Comments - Ground Conditions
-
Supervisors Comments - Pedestrian Routes
-
Supervisors Comments -MEWPS / Mast Climbers, Vacuum Lifters & Any other Equipment
-
Supervisors Comments - COSHH & Environmental
-
Supervisors Comments - Dust / Noise / Vibration / Manual Handing
-
Supervisors Comments - Dust Masks / Ear Defenders issued / Available ?
-
If No - State actions
-
Supervisors Comments - Havs Assessment Underataken?
-
If No - State actions
-
Supervisors Comments - Task rotation being used when drilling concrete?
-
Supervisors Comments - Works IN MC Delayed this week due to high winds?
-
Supervisors Comments - Welfare & Toilets Frequently all OPK
-
Supervisors Comments - Proximity of Mast Climbers to Pedestrians
-
Supervisors Comments - Any other comments / concerns
-
Have all workers certifications been verified and recorded for the activities undertaken? (CSCS/SMSTS/IPAF/PASMA)
-
If No - State actions
-
Have all site workers received a Titan Site Induction, completed the personnel record and provided the next of kin details?
-
If No - State actions
-
Have all workers completed a health surveillance Questionnaire?
-
If No - State actions
-
Has a toolbox talk been carried out this week ?
-
If No - State actions
-
Have all operatives read and signed the RAMS as confirmation of understanding & adherence to them ?
-
If No - State actions
-
Do all workers have the correct PPE for the intended tasks / activities and are ALL site PPE requirements followed at all times ?
-
If No - State actions
-
Is housekeeping being maintained to an acceptable standard ?
-
If no please explain why?
-
Do all MEWPS have current LOLER certification and are daily checks completed and retained in the site file? Are the ground conditions safe for MEWPS
-
If no please explain why?
-
Are all Scaffold Towers erected and regularly inspected by PASMA trained workers? Is A Scaftag fitted and updated every 7 days as a minimum?
-
If No then please explain why ?
-
If Mast Climbers (MCWP) are used, has a handover certificate been completed and recorded on site file ?
-
If no please explain why?
-
Are Daily pre-use inspections carried out for MCWP's and are they recorded in the site file ?
-
If no please explain why?
-
Are relevant certificates available and retained for all other equipment / machinery / tools and vacuum lifting units etc?
-
If no please explain why?
-
Are all workers trained and competent with the tools / Equipment or Machinery they are required to use ?
-
If no please explain why?
-
Is there adequate edge protection in place around all open edges in the working at height areas?
-
If no please explain why?
-
Are safety harness' i use and being worn, used and inspected correctly?
-
If no please explain why?
-
Are all tools, materials & COSHH substances being stored safety including when working at height?
-
If no please explain why?
-
Are tools and equipment free from visible damage and misuse ?
-
If no please explain why?
-
Are the welfare facilities adequate and suitable for purpose?
-
If no please explain why?
-
Have all actions and comments been actioned ?
-
If no please explain why?
-
Please Sign
Site Diaries (Weekly)
-
Site:
-
Inspection Carried Out By:
-
Week Commencing:
Site Diaries - Click Again for Another Day
-
Select Day:
- Monday
- Tuesday
- Wednesday
- Thursday
- Friday
- Saturday
- Sunday
-
What is the Weather like?
-
Wind Level?
-
Labour:
-
Progress:
-
Delays & Reasons:
-
Instructions & Drawings Received:
-
Covered by B of Q:
-
Visitors:
-
Signature
Weekly Progress Reports
-
Site:
-
Date:
-
Prepared For:
-
Issues Identified:
Specify Area, Insert Information & Image - Click Again To Add Sections
-
Area:
-
Information:
-
Images:
LOLER - Lifting Operations & Lifting Equipment Regulations 1998 Report Inspection Form
-
Site Name:
-
Site Code:
-
Inspection Carried Out By:
-
Your Position:
Equipment - Click Again to Add Another Equipment
-
Description of Equipment & Means of Identification:
-
Date of Inspection:
-
Safe Working Load (if Applicable):
-
Result of Inspection:
-
Signature
PUWER - Provision and Use of Work Equipment Regulations1998 Report Inspection Form
-
Site Name:
-
Site Code:
-
Inspection Carried Out By:
-
Your Position:
Equipment - Click Again to Add Another Equipment
-
Date of Inspection:
-
Description of Equipment & Means of Identification:
-
Safe Working Load (if Applicable):
-
Result of Inspection:
-
Signature
MEWP - Provision and Use of Work Equipment Regulations 1998 Report of Inspection Form
-
Site Name:
-
Site Code:
-
Inspection Carried Out By:
-
Your Position:
Equipment - Click Again to Add Another Equipment
-
Date of Inspection:
-
Machine ID:
-
LOLER Certification Available & Current?
-
If No Please explain:
-
Free From Visual Faults, Defects or Damage ?
-
If No - insert defects & actions taken
-
Handrails and/or Guards are all fitted & secure?
-
If No - insert defects & actions taken
-
Are all Audible & Visual Warnings functional?
-
If No - Please sate actions:
-
Safe Working Load Chart & Operating Instructions clearly Visible ?
-
If No - Please state actions:
-
Ground Conditions are Inspected & are suitable ?
-
If No - Please state actions:
-
Signature:
MCWP - Mast Climber - Provision and use of Work Equipment Regulations 1998 Inspection Form
-
Site Name:
-
Site Code:
-
Inspection Carried Out By:
-
Your Position:
Mast Climber: Click Again to Add Another Mast
-
Date of Inspection:
-
Mast ID:
-
Mast Location:
-
Base Structure adequately supported?
-
If No - Please state actions:
-
Platform Deck, Handrails, Mat Guards Fitted & Secure?
-
If No - Please state actions:
-
Visual Check on the Tie Anchors into Concrete?
-
If No - Please state actions:
-
Mast Bolts Fitted & Secure?
-
If No - Please state actions:
-
Safety Limit Devices Checked?
-
If No - Please state actions:
-
Safety Working Load Chart & Operating instructions Clearly Visible?
-
If No - Please state actions:
-
Signature:
Operated Plant Daily Inspection Checklist
-
Operator:
-
Plant Type:
-
Plant I.D Serial Number:
-
CPCS/NPORS No:
-
Week Commencing:
Daily Check - Click Again for Another Day
-
Select Day:
- Monday
- Tuesday
- Wednesday
- Thursday
- Friday
- Saturday
- Sunday
-
Date:
-
Please Select what has been Checked:
- Mainframe - Including Guards, Covers and windows where applicable
- Mirrors and seatbelt in good condition
- Tyres for damage, wear & pressure
- Hoses
- Oil & Water levels
- Hydraulic Oil System
- Systems for Leaks
- Cables & Booms
- Head & Tail Lights
- Brakes
- Pins / Retaining Bolts / Wheel Nuts
- Travel Controls
- Battery Condition
- General Cleanliness of Vehicle
- Door Hinges, Catches / Gate Mechanism
- Check Steps Rungs for Oil Corrosion Etc
- Neutral Start Position
- All Controls i.e Steering, Brakes
- Raising / Lowering Mechanism
- Warning Lights / Instruments i.e Horn
- Warning Beacon
- Emergency Stop / Engine Cut Out
- Reversing Beeper
- Fire extinguisher present, Current & secured (If Fitted)
-
Operator Initials:
-
Operator Signature:
Vibration Exposure Record
-
Site:
-
Site Code:
-
Inspection Carried Out By:
-
Your Position:
Equipment : Click Again to Add another Equipment
-
Equipment Name:
-
Vibration Magnitude (m/s2) :
-
Exposure Points Per Hour:
-
Time to Reach EAV 2.5m/s2 Per Hour Day (above which control measure must be implemented)
-
Monday Tool Trigger Use Time:
-
Tuesday Tool Trigger Use Time:
-
Wednesday Tool Trigger Use Time:
-
Thursday Tool Trigger Use Time:
-
Friday Tool Trigger Use Time:
-
Saturday Tool Trigger Use Time:
-
Sunday Tool Trigger Use Time:
-
Signature:
Lifting Operations Safety Checklift
-
Site:
-
Site Code:
-
Lifting Supervisor:
-
Client:
Pre-Lift Check Points
-
Tick the boxes to confirm the following have been checked (where applicable)
- Cranes Test Certificate
- Crane Thorough Examination Report
- Operator Weekly Inspection Report
- Manufactures Induction Manual
- Test Certificate/Through exam reports for all Lifting Accessories
- Spill Pack Available
- Tool Box Talk Delivered
- Site Induction
- Method Statement & Drawing used
- Risk Assessment Issued
- Slingers Competency Certificate
- Operators CITB approved and carried for Specific Crane
- Communication Method
- Appropriate PPE
Erection Checklist
-
Tick the boxes to confirm the following have been checked (where applicable)
- Working area cordoned off
- Cranes set in correct locations
- Crane Limits & Load indicators OK
- Rigging fitted to item as detailed
- Weather within acceptable Limits
- Lift performed as Method States
- Item accepted by client
- Rigging released as Method States
- Cranes de-rigged
- Site Cleared
Signature
-
Please Sign
Images Of Site
- Images of Site - Click Again to Add More Images
-
Insert Images of Site