This report covers info in the daily report of construction, field progress report, inspector's daily report and field report
Project Information:
-
Project name:
-
Location:
-
Job #:
-
Date and time of inspection:
-
Contract day:
-
Weather conditions:
Personnel on Site:
-
Contractor / Subcontractor
-
-
Site Personnel
Equipment Utilized on Site:
-
Item
-
Type
- air compressor
- air hammer
- asphalt paver
- asphalt distributor
- backhoe
- bulldozer
- concrete bucket
- concrete saw
- concrete screed
- concrete vibrator
- crane, crawler
- crane, truck
- cultipactor
- directional bore
- dragline
- earth mover
- frontend loader
- hand liner
- harrow
- generator
- mechanical tamp
- milling machine
- motor grader
- mulcher
- pile driver / hammer
- power broom
- pump
- roller, steel wheel
- roller, traffic
- roller, vibratory
- rotary tiller / mixer
- skid steer loader
- spreader, box
- spreader, seed
- spreader, fertilizer
- tractor, farm
- transport
- truck, bucket
- truck, dump
- truck, flatbed
- truck, grease
- truck, lane striping
- truck, pickup
- truck, water
- Wellpoint system
-
Equipment active
Work in Progress, Location & Remarks:
-
Item
Safety:
-
MOT?
- Yes
- No
- Not Applicable
-
Describe nature of issue(s):
Safety issue
Problems & Resolutions:
-
Item
Instructions to Contractor:
-
Item
Testing & Inspections:
-
Item
Deliveries: (quantities & description)
-
Item
Photos:
-
Photo:
-
Photo explanation:
-
General Comments:
-
Inspector: