Information

Before starting any new document ensure to refer to previous visits/interactions to identify any outstanding actions that may need to be carried forward. Any progress should be recognised and praised.

  • Engineer details (**payroll number must be included**)

  • Prepared by

  • Conducted on

TELEPHONE POST CHECK

  • Job No

  • Date of Visit

  • Job Type

CUSTOMER - ETA

  • Did your Engineer give you an ETA ?

  • Did your Engineer give you that the Night Before or On the Day of the visit ?

  • Was this via Telephone Call, Text or Voicemail ?

  • Did your Engineer arrive within the original ETA set ?

  • Did your Engineer update you with a new ETA ?

  • Was this via Telelphone Call or Text ?

  • Comments

CUSTOMER - Engineer's Appearance

  • When the Engineer arrived at your Property on scale from 0-10 : 10 is very Smart and Professional in Appearance 0 is Very Untidy and Unprofessional in Appearance

  • Comments

CUSTOMER - Engineers Quality of Interaction and Customer Service

  • Did your Engineer Introduce Him/Herself on arrival ?

  • Did your Engineer Talk you through the Job Prior to beginning any work ?

  • Did anything need to changed form the planned work during the job ?

  • Did your Engineer discuss these changes with you before continuing ?

  • Were you happy with the changes that took place ?

  • Please add comments

  • Did your Engineer ask to show you the completed work I.e. Cable run and Dish location ?

  • Are you satisfied with the Quality of the work completed ?

  • Please add comments.

  • Did your Engineer discuss the work carried out with you on Completion ?

  • Are you satisfied with the Quality of the work completed ?

  • Please add comments.

  • Did your Engineer ask to show you the completed work I.e. Cable run and Dish location ?

  • Are you satisfied with the Quality of the work completed ?

  • Please add comments.

  • Comments

Demonstration / Showcase

  • Did your Engineer give you a Demonstration of the Functions of the Set Top Box ?

  • Did your Engineer show you any New Features that you were not already aware of ?

  • Did your Engineer discuss or show you any of the following Apps ?

  • Comments

Completing the Visit

  • Did your Engineer leave you with a guide showing where you could find support, advice and information ?

  • Did your Engineer leave site clean, tidy and removed any rubbish ?

  • How would you describe the Engineers Attitude towards your Visit : 0 Very Negative 10 Very Positive

  • Is there anything your Engineer could have done to improve the experience for you ?

  • Please add comments on areas for improvement.

  • Was the NPS Survey Promoted ?

  • Engineer Rating - Based on the Visit from your Engineer how likely would you be to recommend Sky to somebody else ?

  • Comments

Comments and Feedback

  • TM

  • Engineer

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.