Information
-
TNZ 40 Fuel transfer from shore to vessel
-
Conducted on
-
Prepared by
-
Is all non approved operational equipment removed from within 8 metres of operations?
-
Are personnel aware of tier 1 spill plan procedures?
-
Are hoses tested and inspected to a set programme ?
-
Is the procedure suspended during inclement weather?
-
Are Drains covered prior to pumping?
-
Are spill kits available?
-
Is as a minimum a 9kg Dry powder fire extinguisher available?
-
Do hoses have dry break couplings?
-
Are staff trained to perform the required tasks ?
-
Are flotation devices available? And worn ?
-
Are Operators wearing high visibility, flame retardant overalls and other PPE?
-
Are dry brake couplings used?
-
Add media