Does this audit include all controls from the most recent hazard and risk register?
-
Are tanks built and inspected against API standards ? And against AS 1940
-
Are tanks dipped prior to discharge and verification of volume to be received completed?
-
Is there a High Level alarm on all tanks ?
-
Is there a High High Level alarm on all tanks ?
-
Are PV Vents or overflow vents in place to release internal pressure
-
Are competent staff used during discharge to walk tank compound checking for irregularities?
-
Are ignition free zones defined ?
-
Are floating blankets used to minimise vapour?
-
Are tanks electronically monitored as well as via GLI ?
-
Are tanks manually inspected every 30 minutes to verify tank volume
-
Is initial discharge pressure 2 bar until product flow verified?
-
Is maximum operating pressure 7 bar ?
-
Is the integrity of the secondary containment verified?
-
Are valves in the bund closed during ship discharge
-
Is the ship discharge rate managed ?
-
Are safe fill levels as per API 2350?
-
Has vapour displacement modelling been undertaken for bulk tanks?
-
Do all tanks have current certificates?
-
Are all bulk tanks compliant with AS1940
-
Is tank bunding as per AS1940?
-
Are Varec and SAAB used during discharge to monitor inflow ?
-
Do we only discharge into one tank at any time?
-
Is there a pre discharge check of dips against Varec and SAAB?
-
Are two operators on site during discharge?
-
Any comments?
-
Any photos