Information

  • Document No.

  • Site Name

  • Site code

  • Conducted on

  • Prepared by

  • Location
  • Site Photo

  • Personnel/ contractors present

general site information

  • Site DCB received and complete?

  • All site installation equipment received and complete & undamaged

  • DN signed and returned

  • Safe access to site

  • Site access photo

  • Safe working environment on site

  • Health and Safety documents on site

  • Have you been inducted on site

  • Risk assessment completed

  • Site clean & tidy after installation

  • Any/ All damage during construction repaired

  • All package material removed from site and cabinets

  • Site compound/ rooftop etc lock and secure on exit

  • Documentation checked and accurate where applicable, as per as built requirements

Transmission

  • Transmission link to core network verified (E2E)

  • Floor plan showing where 7705 is installed including port allocation for SFP

Cabinet installation

  • Transfer plate installed as per DCB( where applicable)

  • Cabinett installed as per DCB

External feeders [where applicable]

  • Correct feeder type has been installed ( refer to DCB)

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.