Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Description of Works
-
Add location
-
Select date
-
Contact Phone and Email address
General Requirements
-
Is the Site Safety Plan and documentation up-to-date?<br>
-
Have sub-contractors safety plans been approved?
-
Is there a current Hazard/Task Analysis Register/Site hazard board?
-
Is there a site layout diagram. Showing the location of safety equipment, emergency assembly points, first aid kits etc?
-
Have Notifiable Works been notified to DoL (Working at heights, scaffolding, trenching, cranage etc)?
-
Are there records of regular Tool Box meetings, Pre-Start meetings that include H&S and are dated, sign?
-
Is there evidence that regular contractor and sub-contractor audits are being carried out and recorded?
-
Is their a trained safety supervisor on site?
-
Is there records of all persons on site being suitably inducted?
-
Is there a training and competency register? Are all personnel competent/ticketed for the role( confined spaces, working at heights, powder actuated tools, plant and machinery operation, spotter etc).
-
Do all personnel on site have current Go-Safe or Site Safe Passports or equivalent?
-
Have site services including gas mains, underground and above ground electricity been identified in the site specific safety plan?
-
Is there evidence of an accident/incident being recorded in the incident register? Do they match those reported to Todd Property each week?
-
Is there evidence that corrective actions from accidents/incident investigations are recorded and all controls closed out at tool box meetings?
-
Are all lunch rooms, toilets and wash areas clean?
-
Is there shade, water and other amenities for staff on site?
-
Is there good safety signage on site?
-
Are all personnel wearing the required PPE?
-
Is the PPE up-to-date and in good condition?
-
Are tools and equipment in good condition?
-
Is work carried out within one meter of gas, electricity and high pressure water?
-
Have the necessary work permits been issued by the main contractor?
Hazardous Substances
-
Is the hazardous substance register up-to-date?
-
Are the Material Safety Data Sheets maintained and available? Are they less that five years old?
-
Are the hazardous substances stored in a safe and secure manner?
-
Are personnel handling the hazardous substances trained and experience in their use?
-
Are the quantities of the hazardous substances recorded and has all the information been provided to Todd Property?
-
Has suitable provision been made for extra first aid supplies as required by the MSDS?
Public Safety
-
Are their safe alternative routes around the site for pedestrians and vehicles?
-
Is there visible safety signage on all approached to the work site?
-
Are al pedestrian and public footpaths clear?
-
Are materials on site stored safely?
-
Are all excavations/holes covered or fenced/ barricaded to restrict access?
-
Have all affected residents been notified? Has there been any complaints? Is there evidence of the complaints being closed out?
Traffic Management
-
Is there an approved Traffic Management Plan (TMP) in place?
-
Does the traffic management on site conform to the TMP?
-
Is the TMP current, approved and dated?
-
Is the STMS less than 1/2 hour away or on site?
Site and Security
-
Access gates found secured with relevant security and safety signage?
-
Is the equipment/machinery on site serviced, in good condition and secure at night?
-
Is the site clearly defined with all works contained within the work site?
-
Is there fencing or barricades in place appropriate for the hazards?
-
Is the storage of materials, tidy, safe and secure?
-
Access not obstructed with loose ground/trip hazards?
Electric Equipment
-
Is the electric equipment inspected and correctly tagged (three months or less)?
-
Is electrical equipment in good condition?
-
Are correct Splitters/RCDs being used for electrical equipment?
-
Where required are leads off the floor?
Emergency Equipment
-
Is there an emergency plan in place? Has it been tested on-site in the past 12 months?
-
Is there a correctly tagged and tested fire extinguisher on-site?
-
Is there a up-to-date and suitable first aid kit on-site?
-
Are the first aiders clearly identifiable, are all their qualifications up-to-date?
Working at Heights
-
Are personnel using work platforms on-site?
-
Solid hand rails
-
Correct PPE, including harnesses
-
Safe tag
-
Decking/fencing/ barriers in place?
-
Lines secured correctly
-
Lines and Harnesses certified?
-
Emergency procedures in place and practiced?
-
Working at Heights training provided?
-
Have Notifiable Works been notified to Todd Property and DoL?
Scaffolding
-
Safe tags in place?
-
Decking in place?
-
Hand rails/Fencing in place?
-
Access ladders and trap doors installed and used/ closed correctly?
-
Kick Boards in place?
-
Ties/Bracing in-place correctly?
-
Foundations in place correctly?
-
Have Notifiable Works been notified to Todd Property and DoL?
Confined Space Entry
-
Work Permit to enter forms at hand?
-
Is access to the area restricted?
-
tripod and winch being used?
-
Gas detectors being used?
-
Fan forced air being used?
-
Are all personnel trained and certified?
-
Emergency procedures in place and tested?
-
Breathing apparatus and other PPE being used correctly?
-
Have Notifiable Works been notified to Todd Property and DoL?
Plant and Machinery
-
Being operated correctly and safely?
-
ROPS/FOBS/Tops fitted
-
Amber Beacon operating?
-
COF/WOF/ inspection certificate visible and current?
-
Plant in good condition?
Evacuation and Trenches
-
if the trench/ evacuation 1.5 metres deep?Have Notifiable Works been notified to Todd Property and DoL?
-
Batters and sides ok?
-
Trench shields/shoring ok/ certified?
-
Is access to the site restricted?
-
Discharge silt free, not scouring?
Environment
-
Fuel stored correctly?
-
Spill kits available and all provision to prevent fuel leakage in place?
-
Dust control in place?
-
Are all roads, footpaths, streams and storm water retention ponds free of debris?
-
Silt ponds fenced with signage?
-
Bunds and Decants in place?