Audit

Water Jet (North Wall)

Is area free of obstruction?

Is the solution within 6 months of mixing date?

Are the pull straps securely tightened?

Machine Shop

Is area free of obstruction?

Is the solution within 6 months of mixing date?

Are the pull straps securely tightened?

Tooling Inspection (west wall)

Is area free of obstruction?

Is the solution within 6 months of mixing date?

Are the pull straps securely tightened?

Tooling fabrication (East Wall)

Are bottles readily available and unopened?

Tooling R&D

Activates in 1 second or less?

Is area free of obstruction?

Is the flow of water clear?

Welding area (cabinet)

Are bottles readily available and unopened?

Add signature
Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.