Title Page
-
Client
-
Topan job number
-
Site address
-
Inspection conducted by
-
Onsite Topan representative (supervisor)
-
Date of inspection
1. GENERAL DOCUMENTATION COMPLETE
-
RAMS completed by Topan health and safety ?
-
Reason that RAMS were not completed ?
-
Hard copy of method statement for the works available to the team onsite ?
-
Why is the method statement not available ?
-
General installation paperwork correct to requirements and site specific ?
-
Why is the paperwork not correct ?
-
-
Has the Topan daily briefing record been completed by the team onsite and signed for ?
-
If no why ?
-
Has the Topan daily vehicle and trailer pre-start checklist been completed for today ?
-
If no why ?
-
If the site is a highways project do work vehicles have chapter 8 ?
2. SITE SAFETY
-
Site supervisor holds SSSTS
-
Reason for no SSSTS ?
-
Topan installation team all hold CSCS cards ?
-
If no why and what is the reason for no CSCS card and who doesnt hold a CSCS card ?
-
Installation team wearing mandatory PPE ?
- Hard hat
- Correct hi vis workwear for site
- Safety boots (not rigger type)
-
Is the PPE being worn correctly ?
-
Explain what is being worn incorrectly ?
-
Installation team has access to general PPE ?
- Gloves
- Eye protection
- waterproof jacket & trousers
-
Is there a valid reason ?
-
Is the correct type of PPE being worn for each work task at present ?
-
What PPE is not been used correctly ?
-
Installation team has access to specialised PPE for work with chainsaws, chippers, brushcutters etc ?
-
what specialised PPE kit is not available and why ?
-
Site supervisors mobile phone in working order ?
-
If not why ?
-
Plant/Equipment in working order ?
-
If not why ?
-
Plant operators hold relevant certificates (verbal answer, can be checked if required and certificates supplied to site)
-
If no why ?
-
Fuel in the correct cans and marked ?
-
If no why ?
-
Spill kits available ?
-
Why not ?
-
Materials stored safely ?
-
If no why ?
-
Noise and dust control ?
-
If no why ?
-
HAVS Control in place ? eg: job rotation
-
If no why ?
-
Fencing made secure at end of each shift ?
-
If no why ?
-
Open excavations covered/protected ?
-
If no why ?
3. GENERAL SITE WELFARE
-
Are welfare facilities available ?
- Clients onsite
- Transient site ( Local facilities available)
- Mobile 'hog' unit onsite
- The site is not a transient site and no facilities have been made available
-
Why haven't welfare facilities been made available to the installation team ?
-
Emergency arrangements in place ? eg: muster points etc
- Yes covered in site induction
- Yes because site is a remote site this has been covered in the daily briefing by the team leader
- No
-
If no then why ?
-
Fire precautions in place ? eg: fire extinguishers etc
- Clients onsite
- Topans own within vehicles
- No - none available onsite or within vehicles
-
If no why ?
-
general housekeeping onsite, are the work areas tidy ?
-
If no why ?
-
Lighting levels adequate ?
-
If no why ?
-
Do the installation team have safe access/egress to and from site ?
-
If no why ?
-
Is first aid available onsite either via first aid kits (in date, fully stocked) in vehicles or client first aid provisions ?
-
If no why/what is the date on vehicle first aid if expired ?
4. ONSITE STAFF BRIEFING AWARENESS
-
Team has been made aware of the following from the team supervisor via a staff briefing ?
- Safety briefing
- Risk/COSHH/Environmental assessments (RAMS)
- First aider has been identified
- Site emergency assembly/muster point (Allocated by team leader)
- Correct manual handling techniques (training carried out periodically)
- Emergency reporting procedure (contact numbers in RAMS)
5. ROAD & PUBLIC SAFETY/SEGREGATION
-
Signage eg: speed limits
-
If no why ?
-
Barriers, cones in place ?
-
If no why ?
-
Open excavations on the road area covered/protected ?
-
If no why ?
6. SAFE SYSTEM OF WORK EMPLOYED (RAIL)
-
Are safe systems of work in place for.....
- Not a rail site
- Safeguarded
- Fenced
- Site warden warning
- Equipment warning (ATWS/TOWS/LOWS)
- Lookout response
- Briefing arrangements
- COSS wearing armband
- Site warden correctly equipped (if applicable)
- Lookout correctly equipped (if applicable)
- Barrier fence erected correctly (if applicable)
- Use of mobile for emergency calls eg: ensuring you have a signal
7. SAFE SYSTEMS OF WORK (STATUTORY)
-
Are safe systems of work in place for.....
- N/A
- Permit to dig
- Hot works permit
- Confined space permit
- Work at height permit
- Work on OR over water permit
- Briefing arrangements
-
If yes take a photo of the permit if possible
8. LIFT PLAN
-
Is a lift plan in use by Topan fencing ?
-
What is the lift plan number ?
-
Is the equipment on the lift plan correct to what is being used onsite ?
9. ENVIROMENT
-
Provisions in place for......
- Waste management (Covered in RAMS)
- Noise/Vibration (HAVS paperwork with RAMS)
- Air pollution ( within RAMS ERA)
- water/Ground pollution (within RAMS ERA)
- Spillage/Use of spill kits etc (Spill kits within vehicles)
- Protected species (within RAMS ERA)
- Tree preservation order (TPO within RAMS ERA)
- Heritage/Archaeology (within RAMS ERA)
10. WORK QUALITY CONTROL
-
Is the quality of the following upto standard....
- N/A
- Fencing
- Gate operation
- De-vegetation
- Ground re-instatement
- General housekeeping standards
-
take photo as proof
11. GENERAL COMMENTS
-
general overview of Topan supervisor
-
general overview of Topan inspector