Title Page

  • Conducted on

  • Prepared by

  • Take 5 has been filled

  • Hazard has been identified/discussed

  • Do you have all proper tools for the work ?<br>

  • All Crew member has appropriate trainings

  • Job has been discussed in the team ?

  • If more than 2 Crew members

  • Pre Start has been filled

  • She form has been filled

SHE/TMP

  • All safety measure are implemented

  • Add pictures

  • 3 Safety measure are implemented

  • Add pictures

  • Proper TMP has been placed

  • Add pictures

  • If Trenching involve ISB, utility service has been identified

OSB Task

  • OBS plan obtained

  • Add photos

  • MAD

  • Add photos

  • Utility service plan has been obtained

  • TMP is placed

  • Add photos

  • 1.2m pedestrian corridor has been considered on the footpath

  • Restricted poles have been identified ?

  • Add photos

Site check after Completion Job

  • All the fibre waste has removed

  • Dust from hole has cleared

  • All standard has been followed

  • Reinstatement has done properly

  • Before and after work photos has been taken

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.