Title Page
-
Viscore ID & Site Address
-
Site Address
-
iTools Reference number -
-
Technician/Company
-
Field Manager
-
CSA
-
Conducted on
-
Prepared by
-
Site Type
-
Class key
-
Fibre Installation Checklist - Communal Area
- Hard
- Soft
- Aerial
- Surface Mount
- Jointing
- Hauling
-
Excavation type
- Trench - linear meters
- Open excavation - square meters
-
How many meters?
-
Hard surface type
- Concrete
- Seal
- Cobbles
-
Excavation type
-
How many meters?
-
Excavation type
-
How many meters
-
Excavation type
-
How many meters?
-
Hardware Installation Checklist
- Budi Installed
- IFDB Installed
- RAT Installed
- Ruggerdised Installed
- Other
-
Quantity of Hardware installed? e.g 1x RAT, 2x 30m Ruggedize
-
Was the equipment installed, laid up and labelled correctly?
-
Why has the equipment not been installed, laid up & labelled correctly?
-
Has CVLS testing been completed?
-
How many fibres have been connected?
-
Which fibre was CVLS tested?
-
Why has CVLS testing not been done?
As-built photo evidence
-
Photo of MDU/ROW starting point as per design document
-
Why no photo of starting point?
-
2) Photos of MDU/ROW starting point as per scoping document.
-
Additional information of MDU/ROW starting point as per scoping document
-
Pre-start photos of surfaces prior to works e.g trenching / slot cutting
-
Why no pre-start works photos?
-
Photo of surfaces prior to works e.g trenching / slot cutting
-
Additional information of surfaces prior to works e.g trenching / slot cutting
-
Photos where change in methodology occurs e.g. shallow trench to surface mount
-
Why no photo's where methodology changes?
-
Photos where change in methodology occurs e.g. shallow trench to surface mount
-
Additional information where change in methodology occurs e.g. shallow trench to surface mount
-
Photos where assets installed e.g. hand holes, IFDB's, Pedestals, BUDI's, boundary pegs
-
Why no photo's of installed assets?
-
Photos where assets installed e.g. hand holes, IFDB's, Pedestals, BUDI's, boundary pegs
-
Additional information where assets installed e.g. hand holes, IFDB's, Pedestals, BUDI's, boundary pegs
-
Photos of surfaces after final permanent reinstatment
-
Why no photos of permanent reinstatement?
-
Photos of surfaces after final permanent reinstatment
-
Additional information - e.g dimensions of concrete cut, removed and reisntated.
-
Is site ready for provisioning?
-
Why is site not ready for provisioning?