Information
-
Document No.
-
DC Signals TPA 1.1 Audit
-
Date/time
-
Assessor Name
-
Location
-
Qualification
Common Questions
-
1. If you were looking after a work crew using 908 blocking, which of the following documents must you have:
-
2. Looking after a HiRail vehicle under 908 Blocking with 2x Personel who needs to be locked on?
-
3. You are running Compulsory stop boards (905) and a Hi-Rail vehicle needs to work 200m inside your Stop Boards, what do you do?
-
4. Loops within stations are covered in a Track Warrant?
-
5. On completion of a 908 authority, which of the following must be documented?
- (a). Blocking release time & All men and Machinery in a safe place time
- (b). All men and Machinery in a safe place time
- (c). Blocking release time
- (d). Cancelled strike through form
- (e). Blocking release time, All men and Machinery in a safe place time & Cancelled strike through form
- (f). Cancelled strike through form & Blocking release time
-
6. When running compulsory stop boards (905), when can you erect your stop boards?
-
7. You require a TS94 when operating compulsory stop boards?
-
8. When operating Lockout Zones (919) when is it safe to start work, after speaking with Train Control
-
9. When using Lockout zones, are TS92’s required?
-
10. When using Emergency Protection, at what distance should the stop disk be erected?