Information
-
Document No.
-
DC Signals TPA 1.4 Audit
-
Date/time
-
Assessor Name
-
Location
-
Qualification
Common Questions
-
1. What constitutes a Multiple work Area?
-
2. A work area planning board is not required to run a multiple work area
-
3. If you are running a multiple work area, is secondary protection required?
-
4. You have 4x Level crossings under your work area on manual control, where do you document these?
-
5. Who ultimately holds the responsibility of a work trains movements within your work area?
-
6. A MTMV within your work area has been issued a SWAR 3 within a station, who holds this SWAR?
-
7. What is an ARP’s role operating under a RPO?
-
8. Can a site protector set routes with Train Control for HiRails within his TS96 authority?
-
9. What is the correct secondary protection layout? In order from start to finish
-
10. Can you have two separate MTMV groups working in the same limits as separate mobile work sites.