Title Page
-
Site conducted
-
Location
-
Conducted on
-
Auditor Name
-
Network
-
Traffic Management Company Name:
-
Traffic Management Crew Leader:
-
Principal Contractor / Client:
-
Responsible Road Authority:
- VicRoads
- Local Council
-
VicRoads Accreditation?
-
Road Type:
- Cat 1 - Collector Roads - Local Council
- Cat 1 - Major Road - Local Council
- Cat 2 - Primary State Arterial Roads (VicRoads)
- Cat 2 - Secondary State Arterial Road (VicRoads)
- Cat 3 - Tollways
- Cat 3 - Freeways
-
Normal Speed Limit Through Area:
- 100km/h
- 90km/h
- 80km/h
- 70km/h
- 60km/h
- 50km/h
- 40km/h
- 30km/h
- 20km/h
- Road Closure
-
Worksite Speed Limit Through Area:
- 100km/h
- 90km/h
- 80km/h
- 70km/h
- 60km/h
- 50km/h
- 40km/h
- 30km/h
- 20km/h
- Road Closure
-
Implemented Traffic Control Type:
- Road Closure
- Shoulder
- Shuttle Flow
- Contra Flow
- Lane Closure
-
Number of Traffic Controllers Onsite:
-
Clearance to live Traffic:
- 0-1.2m
- 1.2<3.0m
- 3.0<6.0m
- 6.0<9.0m
- 9.0<12.0
- >12m
- Road Closed
- Pedestrian Diversion
-
Road Condition:
- Curves / Crests
- Steep Ascent/Decent
- Poor Sight-Distance
- Slippery Surface
- Other
-
Site Conditions:
- Obscured Vision?
- Presence of pedestrians or cyclists or vulnerable road users?
- Access to property or business affected?
- Public transport affected?
- School zone present in worksite?
- Traffic Lights?
- Stop Sign?
- Give Way Sign?
- Roundabout?
- Wildlife/Snakes?
- Conflicting Speed Signage?
- Poor Lighting?
- Fixed Barriers on Road/Highway?
- Multiple Work Parties?
-
Weather Conditions:
- Bright Sun
- Rain
- Wind
- Cloud
- Fog
- Drizzle
- Sleet
- Heat Wave
- Cold Wave
Administrative
-
Has the Traffic Management Crew completed a JSA / Toolbox?
-
Is a completed Safe Work Method Statement available onsite?
-
Is a Site-Specific Traffic Management Plan available upon request?
-
Do the risk assessments reflect ALL hazards of the job and have the appropriate control measures been documented?
-
Has the Traffic Control WSL signed onto the CitiPower/Powercor/UE/Resource Partner JSA?
-
Is a Traffic Guidance Scheme (TGS) available upon request?
-
Are there any amendments to the TGS & has this been documented?
-
Is the TGS appropriate & truly depicts the site conditions? Including Pedestrian Management.
-
Is there a copy of the Traffic Memorandum of Authority <br>(“Permission for works on the road”) available and on site?
-
Is Approved Written Authorisation available upon request?
-
Is the Road Closure Approval available upon request?
-
Is sufficient information available to safely undertake the work? (e.g. Job file, location references, road speeds etc
-
Is the job being performed in accordance with the Work <br>Request?
-
Add media
Implementation & Control
-
Does the worksite signage accurately reflect and provide appropriate instruction for the works?
-
Are the appropriate traffic management signs & devices being used? (Class1 Retro Reflective)
-
Advanced warning signs?
-
Work site signs?<br>(Symbolic Worker - Bright Orange)
-
Speed Indicator signs / Speed Advisory signs?
-
Are flags correctly used? (e.g., In the initial approach & all speed reduction signs)
-
Symbolic Traffic Controller and Prepared to Stop used together if a Traffic Controller will be stopping traffic?
-
Traffic cones/bollards/ barriers (with Retro Reflective bands)?
-
Detour signs / Road Closure signs?
-
Divergence signs?
-
Pedestrian signs?
-
Electronic indicators/ arrows?
-
Stop/slow battens?
-
Is the signage in a reasonable condition and of the correct size?
-
Is the signage legible, safely placed and clear of obstructions?
-
Are ALL spaces in multi-message signs filled? (with reflective <br>yellow blank minimum)
-
Contradictory & Distracting Permeant Signs Covered Up or Removed?
-
Have signs been mirrored (duelled, gated) when required?
-
Are Multi Frames Used Correctly (no gaps & correct heights)?
-
Are side Streets Signed?
-
Are Detour Signs In Place & Displayed Correct?
-
End Road Works & Return Speed Displayed?
-
Has signage spacing and distances of worksite components been determined correctly, including adjustments to suit site-specific conditions?
-
Are minimum lane widths being maintained?
-
Clearance Between Workers & Traffic Being Maintained?
-
Is the 600mm clearance being maintained between the extended EWP boom elbow and/or crane counter weight and cones/barriers/bollards?
-
Access To Side Roads & Properties Been Provided?
-
Has possible traffic congestion been considered and are sufficient measures in place to avoid it?
Provisions for Vulnerable Road Users
-
Are pedestrians or cyclists required to move past or around the work site or cross the road within a worksite?
-
Have suitable pedestrian/cyclist signs been installed?
-
Are pedestrians/cyclists being assisted through the worksite?
-
Are there adequate paths/ramps and are these clear of obstructions?
-
Add media
Traffic Controller(s)
-
Do all field personnel responsible for setting out, implementing and/or monitoring a Traffic Guidance Scheme hold a current RIIWHS302D qualification valid for 3 years?
-
Traffic Controller(s) Have Required Tickets (including traffic tickets, white/red card, first aid & client induction)?
-
Sufficient Traffic Controller(s) Onsite?
-
Have communication methods been established and maintained between traffic controllers and work crews?
-
Traffic Controller(s) Completed the required Project /Client Inductions?
-
Is the appropriate PPE being worn correctly? E.g., Safety Glasses, Lace Up Safety Boots, Hardhats & Hearing Protection?
-
AS/NZS 4602 High Visibility Worn & In Good Condition?
-
Traffic Controller(s) correctly position to control Traffic in A Safe Manner?
-
Traffic Controller(s) Have an Escape Route Easily Available?
-
Traffic Controller(s) Have Adequate Communication? (e.g., Two-way Radio)
-
Have rotation & rest periods of traffic controllers been considered?
-
Add media
Vehicles/Plant & Equipment
-
Do the vehicles have CP/PAL signage correctly displayed?
-
Is vehicle(s) / plant parked correctly and safely (e.g., not on a nature strip, not blocking a driveway, not in a no-standing area)
-
Are ALL vehicle warning lights/arrows operable and being used appropriately? (Flashing Lights need to be operating when in a designated work zone unless on Private Property or over 3 metres from the edge of the road)
-
Can equipment be securely restrained when in transit?
-
Is there a First-Aid Trained Person from the Traffic Control Crew?
-
Is The Fire Extinguisher Available, Pin Inserted & Tag In Date?
-
Is The First Aid Kit Available & In Date?
-
Add media
Summary
-
Is the method of traffic/plant/pedestrian management onsite suitable & effective?
-
Observations - Opportunities for Improvement:
-
Areas of Non-Compliance:
-
Follow Up Actions:
-
Comments
-
Auditor Name & Signature