General conditions and project status
-
Field notes
Roof Top Equipment Installation
Roof Top Equipment Installation
-
Audit this category
RTU #
-
Installed
-
Curb Installed
-
Seismic Brackets Installed
-
Power Installed
-
Gas Installed
-
Condensate Drain Installed
-
Duct Work Installed
-
Turning Vanes Installed
-
Return Duct Installed
-
Duct Smoke Detector Installed
-
GRD'S Installed
-
Check Details M301 #1, M302 #2
VAV Installation
VAV installation
-
Audit This Category
Audit #
-
Enter VAV ID
-
Installed
-
Labeled
-
Hot Water Valve Installed
-
Flex Duct Installed
-
Serviceability of Unit
-
Power to FPVAV
-
Flow and Balancing Valve Installed
-
Check Details M301 - 3,5,6
Exhaust Fan Installation
Exhaust Fan Installation
-
Audit This Category
EF #
-
Installed
-
Bottom of Hood 18" above roof deck
-
1/2" gap between hood and curb
-
Labeled Correctly
-
Power Installed
-
Is quick release clip installed
-
Speed Controller Installed
-
Check Details M301 #2, M302 #4
Boiler Installation
Boiler Installation
-
Audit this category
Boiler #
-
Installed
-
Power Installed and Treminated
-
Gas Piping and Regulator Installed
-
Flow Switch Installed
-
Low Water Cut Off Installed
-
High Limit Switch Installed
-
Balance Valve Installed
-
Boiler Pump - Wired to Boiler
-
dissimilar metal piping connections handled correctly.
-
Flue 4" PVC Installed
-
Flue Stack height
-
Exhaust height
-
Exhaust 12" or more above the intake
-
Intake 18" above roof deck
-
Flue Supports Installed
-
System Filled
-
Was System Flushed and Cleaned
-
Chemical treatment
-
Bird Screen Installed on Flue
-
Are All Thermometer Installed and Readable
-
Are All Gauges installed and readable
-
All BAS Sensors Installed
-
System Pumps installed, wire, rotation checked
-
DPT installed
-
Is bypass installed
-
Water Meter Installed
-
Manual Air Vents Installed in proper location
-
All drain run to floor drains
-
Boiler Inspection Scheduled
-
Select date and time
Utilities Installation
Utilities Installation
-
Electrical Installed
-
Gas Installed
-
Water Installed
Engineers JSO Report
Engineers JSO Report
-
Acceptable or correction needed
-
Enter Auditor Name and Initial
Warehouse Door & Unit Heaters
-
Warehouse Heater Installed?
-
Garage Door Installed?
-
Front Entry Heater
-
Utility Room Heater
Freezer Installation
-
Freezer Box Installed?
-
Allen Bradley Panel Installed?
Equipment Delivery
-
HVAC Equipment Delivered
-
Tracer Panel (SC, UC600, Router, PM014, XM70, BACNET Term)
-
Senva Current Sensors (2)
-
Diff Pressure Sensor, Cables, Display
-
WCI Coordinators & AirFi Stats
-
Wire - (1) Box Comm 500', (1) Box 18-2 250', (2) Box 18-2 500'
-
Veris H120 Current Sensors
-
Building Static Pressure Pick Up Tube
-
Garage Door Contact
-
Poly Tubing
-
Glycerin Temp Probe
-
Kele Rib Relay (8)
-
XMFR - 24V (2)
-
Antenna Cable & Antenna
-
Thermal Compound
-
Freezer Equipment Delivered?
-
Acceleration & Vibration Sensors/Cables/Disks (16 Items)
-
Plastic Welder Tube
-
Danfoss Pressure Sensors (4)
-
Temperature Sensors (8)
-
Senva Current Sensors (6)
-
Wire - Box 18-2 250' (10)
-
Freezer Enclosure (UC600, XM70, WCI)