Title Page
-
Document No.
-
Client / Site
-
Audit Title
-
Conducted on
-
Prepared by
-
Location
General conditions and project status
-
Field notes
Roof top equipment installation
-
Audit this category
RTU #
-
Installed Properly
-
Curb Installation
-
Seismic Brackets
-
Power Installed
-
Gas Installed
-
Condensate Drain Installation
-
Duct Work Installation
-
Turning Valve Installation
-
Return Duct Installation
-
Duct Smoke Detector Installation
-
GRD'S Installed
-
Check Details M301 #1, M302 #2
VAV installation
-
Audit This Category
Audit #
-
Enter VAV ID
-
Installed Properly
-
Labeled Correctly
-
Hot Water Valve Installation
-
Flex Duct Installation
-
Serviceability of unit
-
Power to FPVAV
-
Flow and Balancing Valve Installation
-
Check Details M301 - 3,5,6
Exhaust Fan Installation
-
Audit This Category
EF #
-
Installed Properly
-
Bottom of Hood 18" above roof deck
-
1/2" gap between hood and curb
-
Labeled Correctly
-
Power Installed
-
Is quick release clip installed
-
Speed Controller Installation
-
Labeled Correctly
-
Check Details M301 #2, M302 #4
Boiler Installation
-
Audit this category
Boiler #
-
Installed Properly
-
Power Installed and Treminated
-
Gas piping and regulator Installed
-
Flow Switch Installation
-
Low Water Cut Off Installation
-
High Limit Switch Installation
-
Balance Valve Installation
-
Boiler Pump - Wired to Boiler
-
dissimilar metal piping connections handled correctly.
-
Flue 4" PVC Installation
-
Flue Stack height
-
Exhaust height
-
Exhaust 12" or more above the intake
-
Intake 18" above roof deck
-
Flue Supports Installed
-
System Filled
-
Was System Flushed and Cleaned
-
Chemical treatment
-
Bird Screen Installed on Flue
-
Are All Thermometer Installed and Readable
-
Are All Gauges installed and readable
-
All BAS Sensors Installed
-
System Pumps installed, wire, rotation checked
-
DPT installed
-
Is bypass installed
-
Water Meter Installed
-
Manual Air Vents Installed in proper location
-
All drain run to floor drains
-
Boiler Inspection Scheduled
-
Select date and time
Utilities Installation
-
Electrical Installation
-
Gas Installation
-
Water Installation
Engineers JSO Report
-
Acceptable or correction needed
-
Enter Auditor Name and Initial