Title Page

  • PID #

  • Client / Site

  • Audit Title

  • Conducted on

  • Prepared by

  • Location

General conditions and project status

  • Field notes

Roof Top Equipment Installation

Roof Top Equipment Installation

  • Audit this category

  • RTU #
  • Installed

  • Curb Installed

  • Seismic Brackets Installed

  • Power Installed

  • Gas Installed

  • Condensate Drain Installed

  • Duct Work Installed

  • Turning Vanes Installed

  • Return Duct Installed

  • Duct Smoke Detector Installed

  • GRD'S Installed

  • Check Details M301 #1, M302 #2

VAV Installation

VAV installation

  • Audit This Category

  • Audit #
  • Enter VAV ID

  • Installed

  • Labeled

  • Hot Water Valve Installed

  • Flex Duct Installed

  • Serviceability of Unit

  • Power to FPVAV

  • Flow and Balancing Valve Installed

  • Check Details M301 - 3,5,6

Exhaust Fan Installation

Exhaust Fan Installation

  • Audit This Category

  • EF #
  • Installed

  • Bottom of Hood 18" above roof deck

  • 1/2" gap between hood and curb

  • Labeled Correctly

  • Power Installed

  • Is quick release clip installed

  • Speed Controller Installed

  • Check Details M301 #2, M302 #4

Boiler Installation

Boiler Installation

  • Audit this category

  • Boiler #
  • Installed

  • Power Installed and Treminated

  • Gas Piping and Regulator Installed

  • Flow Switch Installed

  • Low Water Cut Off Installed

  • High Limit Switch Installed

  • Balance Valve Installed

  • Boiler Pump - Wired to Boiler

  • dissimilar metal piping connections handled correctly.

  • Flue 4" PVC Installed

  • Flue Stack height

  • Exhaust height

  • Exhaust 12" or more above the intake

  • Intake 18" above roof deck

  • Flue Supports Installed

  • System Filled

  • Was System Flushed and Cleaned

  • Chemical treatment

  • Bird Screen Installed on Flue

  • Are All Thermometer Installed and Readable

  • Are All Gauges installed and readable

  • All BAS Sensors Installed

  • System Pumps installed, wire, rotation checked

  • DPT installed

  • Is bypass installed

  • Water Meter Installed

  • Manual Air Vents Installed in proper location

  • All drain run to floor drains

  • Boiler Inspection Scheduled

  • Select date and time

Utilities Installation

Utilities Installation

  • Electrical Installed

  • Gas Installed

  • Water Installed

Engineers JSO Report

Engineers JSO Report

  • Acceptable or correction needed

  • Enter Auditor Name and Initial

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.