Title Page
-
This template is equivalent to Tyco Q2235 issue 0 and Tyco Q2234 issue 1 combined. This is electronic issue 1.0 14/01/2016
-
Office
-
Customer
-
Contract No.
-
Audit No.
-
Engineer
-
F.L.M.
-
Auditor
-
Audit Date:
-
Location
-
General engineer information
-
Has the engineer informed the Customer that the system is being worked on?
-
Has the engineer informed the ARC that the system is being worked on?
-
Has the engineer a valid company ID card and lanyard?
-
Has the engineer used the correct issue docket?
-
Has the engineer sufficient dockets?
-
Has the engineer placed any faulty stock into their quarantine area?
-
Has the engineer sufficient faulty stock labels?
-
Has the engineer a full car stock?
-
Has the engineer a calibrated meter?
-
Has the engineer a hard hat and eye protection?
-
Has the engineer secured ladders adequately to the vehicle?
-
Has the engineer looked after company supplied tools and equipment?
-
Has the engineer sufficient tools to do the job adequately?
-
Has the engineer checked signals with the ARC when the work is completed?
-
Has the engineer adhered to the company Health and Safety policy?
-
Is the engineer carrying out an inspection visit or a repair visit?
-
Repairers:
-
Has the engineer gathered all relevant information to help in finding the fault(s) (including the log)?
-
Has the engineer used all the appropriate diagnostic techniques to locate the fault(s)?
-
Has the engineer located the fault(s) in reasonable time?
-
Has the engineer Informed the customer of system limitations during the period of repair?
-
Has the engineer Informed the customer of all faults found?
-
Has the engineer Installed any replacement parts to relevant standards / policies?
-
Has the engineer fully tested any replacement parts installed?
-
Has the engineer made the system safe and operational pending a follow up?
-
Has the engineer arranged a follow up, where applicable?
-
Has the engineer arranged an estimated follow up date for temporary disconnection's?
-
Has the engineer made sure that any permanent disconnection's are endorsed by the customer?
-
Has the engineer described the fault accurately on the Service Docket?
-
Has the engineer used the correct clear codes at Service Bureau?
-
Has the engineer completed the System History Card correctly?
-
Has the engineer completed the BSIA/Fire alarm Logbook?
-
Has the engineer offered training If the fault was due to customer error?
-
Has the engineer returned system to a fully operational state?
-
What discipline is being inspected?
-
Inspectors General:
-
Has the engineer checked the system against the Schedule of Protection?
-
Has the engineer highlighted any faults found?
-
Has the engineer used the correct test equipment?
-
Has the engineer arranged a follow up where required?
-
Has the engineer completed the System History Card?
-
Has the engineer completed the BSIA/Fire alarm Logbook?
-
Has the engineer informed the customer of limitations during test?
-
Has the engineer used the correct clear codes at Service Bureau?
-
Has the engineer informed the customer that the test is complete?
-
Has the engineer informed the ARC that test is complete?
-
Has the engineer checked that the customer is familiar with the operation of the system?
-
Has the engineer completed the Inspection Docket adequately and ensured the customer has endorsed it?
-
Has the engineer returned the system to a fully operational state?
-
CCTV Inspectors:
-
Has the engineer checked with the customer to identify any problems since last visit?
-
Has the engineer visually inspected all components of the system for physical damage?
-
Has the engineer carried out repairs and informed customer and documented where repairs cannot be completed?
-
Has the engineer checked the field of view of cameras against as installed specification and/or drawing?
-
Has the engineer checked camera bracket and housings are secure?
-
Has the engineer checked that all lenses are correctly focused?
-
Has the engineer cleaned lenses and housing windows where necessary?
-
Has the engineer refilled washer bottles where fitted?
-
Has the engineer checked operation of wiper units where fitted?
-
Has the engineer checked operation of pan and tilt units where installed?
-
Has the engineer checked operation of Infra-Red units where installed?
-
Has the engineer checked playback quality of day and night images and made adjustments where necessary?
-
Has the engineer checked the condition of connections to all equipment and repaired if necessary?
-
Has the engineer ensured that all cables at control equipment/psu's are labelled?
-
Has the engineer ensured time and date settings are correct and adjusted where required?
-
Has the engineer cleaned all monitors and adjust where necessary?
-
Has the engineer checked the operation of Power supplies against Record of Operational Checks?
-
Has the engineer checked back up batteries where installed, that they are dated, in date and in good condition?
-
Has the engineer tested the signalling through to the RVRC where applicable?
-
Has the engineer ensured that the recording duration is still as per customer requirements?
-
Has the engineer checked system is ok at RVRC where applicable before leaving site?
-
Inspectors General:
-
Has the engineer checked the system against the Schedule of Protection?
-
Has the engineer highlighted any faults found?
-
Has the engineer used the correct test equipment?
-
Has the engineer arranged a follow up where required?
-
Has the engineer completed the System History Card?
-
Has the engineer completed the BSIA/Fire alarm Logbook?
-
Has the engineer informed the customer of limitations during test?
-
Has the engineer used the correct clear codes at Service Bureau?
-
Has the engineer informed the customer that the test is complete?
-
Has the engineer informed the ARC that test is complete?
-
Has the engineer checked that the customer is familiar with the operation of the system?
-
Has the engineer completed the Inspection Docket adequately and ensured the customer has endorsed it?
-
Has the engineer returned the system to a fully operational state?
-
Intruder Inspection
-
Has the engineer checked with the customer to identify any problems since last visit?
-
Has the engineer checked programming of CIE to ensure that it complies with the requirements of PD6662 & DD243 where applicable?
-
Has the engineer checked reset levels ?
-
Has the engineer checked the method of unsetting are correct with requirements?
-
Has the engineer checked customer authorisation for engineer log on?
-
Has the engineer checked that the Exit/Entry times compliant with requirements?
-
Has the engineer checked that all equipment tampers are operational and indicate at control equipment?
-
Has the engineer checked that all PSU's and signalling devices indicate fault correctly at CIE?
-
Has the engineer checked that all detection devices indicate correctly at CIE(Full walk test)?
-
Has the engineer checked that anti masking is operational on sensors where installed?
-
Has the engineer checked the contract number in banner and checked that there is a telephone label affixed to CIE?
-
Has the engineer checked and amended where necessary, date and time?
-
Has the engineer checked the operation of SAB on both bell test and battery by removing 12v supply to unit?
-
Has the engineer checked all installed batteries with IBT and ensured that they are dated and in date?
-
Has the engineer checked that all equipment and cables are clean and free from damage?
-
Has the engineer checked for any equipment made inaccessible, informed customer and documented?
-
Has the engineer checked as installed document is still correct and amended where necessary with customer agreement?
-
Has the engineer checked current readings of CIE and PSU's against those recorded on Record of Operational Checks?
-
Has the engineer checked that all signals have been sent to the ARC?
-
Has the engineer checked that all signals have been received by the ARC on both signalling paths where dual signalling is installed?
-
Inspectors General:
-
Has the engineer checked the system against the Schedule of Protection?
-
Has the engineer highlighted any faults found?
-
Has the engineer used the correct test equipment?
-
Has the engineer arranged a follow up where required?
-
Has the engineer completed the System History Card?
-
Has the engineer completed the BSIA/Fire alarm Logbook?
-
Has the engineer informed the customer of limitations during test?
-
Has the engineer used the correct clear codes at Service Bureau?
-
Has the engineer informed the customer that the test is complete?
-
Has the engineer informed the ARC that test is complete?
-
Has the engineer checked that the customer is familiar with the operation of the system?
-
Has the engineer completed the Inspection Docket adequately and ensured the customer has endorsed it?
-
Has the engineer returned the system to a fully operational state?
-
Fire Inspectors
-
Has the engineer checked with customer and in log book to identify any problems since last visit have been recorded and rectified?
-
Has the engineer ensured that all cause and effect is isolated unless it forms part of the test process?
-
Has the engineer carried out a visual check of system to ensure that there are no changes to building structure which could affect the operating effectiveness of system?
-
Has the engineer carried out a visual check of the installed equipment to ensure no damage, paint etc is adversely affecting operation?
-
Has the engineer checked operation of the CIE by operating a detection device?
-
Has the engineer tested battery operation of CIE and power supplies to ensure under load test that system can function without mains for the required duration?
-
Has the engineer ensured that batteries are in date and marked accordingly?
-
Has the engineer checked the operation of all signals to ARC where connected?
-
Has the engineer tested the cause and effect where possible OR documented on a docket where this cannot be carried out?
-
Has the engineer tested all detection devices and call points over a 12 month period, documenting which zones and what % tested on each visit.
-
Has the engineer checked that the devices tested report on correct zone and correct text descriptor ?
-
Has the engineer ensured that all unmonitored, permanent lit filament lamps have been replaced?
-
Has the engineer checked and recorded the annual false alarm rate per 100 detectors on ADT488 / Service docket?
-
Has the engineer tested all Fire Alarm devices (sounders, beacons etc) OR documented on docket where this cannot be carried out?
-
Has the engineer ensured that time and date are correct on the CIE where applicable?
-
Has the engineer entered the visit in the customers log book with test results?
-
Inspectors General:
-
Has the engineer checked the system against the Schedule of Protection?
-
Has the engineer highlighted any faults found?
-
Has the engineer used the correct test equipment?
-
Has the engineer arranged a follow up where required?
-
Has the engineer completed the System History Card?
-
Has the engineer completed the BSIA/Fire alarm Logbook?
-
Has the engineer informed the customer of limitations during test?
-
Has the engineer used the correct clear codes at Service Bureau?
-
Has the engineer informed the customer that the test is complete?
-
Has the engineer informed the ARC that test is complete?
-
Has the engineer checked that the customer is familiar with the operation of the system?
-
Has the engineer completed the Inspection Docket adequately and ensured the customer has endorsed it?
-
Has the engineer returned the system to a fully operational state?
-
Access Control Inspectors
-
Has the engineer checked with the customer to identify any problems since last visit?
-
Has the engineer checked the installed equipment against the specification and made any amendments where necessary with customer authorisation?
-
Has the engineer ensured that all installed batteries are in date and are marked accordingly?
-
Has the engineer checked mains and standby supplies to ensure correct operation?
-
Has the engineer checked operation of locks ?
-
Has the engineer checked operation of door closers?
-
Has the engineer ensured that all armature plates are secure ?
-
Has the engineer checked the operation of Break glass units?
-
Has the engineer checked operation of readers and/or Keypads?
-
Has the engineer ensured that the PC is communicating with controller boxes?
-
Has the engineer backed up the database and any historic data?
-
Has the engineer verified operation of the system for fire or any other alarm inputs?
-
Has the engineer carried out adjustments where necessary and documented any outstanding issues which require further attention?
-
Has the engineer ensured that all cables at control equipment / psu's are labelled?
-
Has the engineer ensured time and date settings are correct and adjusted where required?
Audit Checklist Summary
-
Product Audit Score (total number of deviation points)
-
Is this audit a Fire Audit?
-
Please select your Fire Audit Score
-
Please send a copy of your audit to your QEHS Specialist.
-
Please select your Security Audit Score
-
Please send a copy of your audit to your QEHS Specialist.
-
Please send a copy of your audit to your QEHS Specialist.
-
Please send a copy of your audit to your QEHS Specialist.
-
Environmental, Health and Safety Summary
-
In the opinion of the auditor does the Engineer/Sub Contractor work and act in a safe manner?
-
Does the Engineer/Sub Contractor require any EHS refresher training? (if Yes, please state requirement in the section below)
-
Is the Engineer/Sub Contractor trained in all aspects of work related Health and Safety?
-
Has the Engineer/Sub Contractor been issued with up to date Risk Assessments?
-
Did the Engineer/Sub Contractor spot any near Miss, unsafe Acts or Conditions during the Audit?
-
Does the Engineer/Sub Contractor dispose of ADT waste as per company requirements?
-
Please indicate training requirements (if any)
-
Engineers Signature
-
Auditors Signature
-
The following items are for post audit use should they be required.
-
Preventative Actions (i.e. Training):
-
Proposed Close Out Date:
-
Corrective Actions:
-
Proposed Close Out Date:
-
Any Notes & Observations