Information

  • Type of site surveyed

  • Name Of Business

  • Name of Customer

  • Contact number for Customer

  • Email for Customer

  • Conducted on

  • Prepared by

  • Location
  • Are there access control requirements that the installation crew needs to be aware of?

  • ID Documents

  • Access code each morning

  • Identity documents

  • Access pin each morning

Electrical

Main AC connection point & Installed DB'S

  • Single Phase or 3-Phase

  • Three phase equipment?

  • Main AC connection Amps Rating

  • Photos of main AC DB

  • Is Earth Leakage Working

  • Is Customer aware there will be extra cost to fix this.

  • Is There an Installed AC DB for the System

  • Inform Client that we will install Our Own at an extra cost to ensure the installation meets our standards

  • Is the AC DB Installed By Us

  • Take Photo of Ac DB's Installed BY Us

  • Inform Client that we will install Our Own at an extra cost to ensure the installation meets our standards

  • Take Photo of DB Not Installed By Us

  • Is There an Installed DC DB for the System

  • Is The DC DB Installed By Us

  • Take Photo of Installed DB By Us

  • Inform Client that we will install Our Own at an extra cost to ensure the installation meets our standards

  • TJY GAAN SELF BETAAL?

  • Take Photo of DC DB Not Installed by Us

  • Generated to be Connected?

  • Photo of changeover switch (if none it was connected illegally - refer to extra work section)

  • Photo of generator spec plate

  • Breaker size at generator

  • Distance from Generator to Inverter (trench required and power cable extra cost)

  • Is Generator Portable (plug to be used instead of fixed DB)

  • Generator to Feed Gen Port or Changeover (when outside of spec Gen Port will not accept generator)

  • Customer wants Gen started Automatically by Inverter

  • Distance between Inverter and Generator (trench required and signal cable extra cost)

  • Customer will arrange Generator supplier to programme Control Panel to accept NC signal

  • Extra Breakers to be added to essentials

  • Which Breakers

Inverter/s

  • Type of Inverter/s Installed

  • Size of Current Inverter/s

  • What other inverter

  • Current Qty Of Inverters

  • Take Close up Pictures of Inverters, Front and Sides

  • Inverter Upgrade

  • Inverters to add

  • Cable Run from Inverter to Main DB

  • Have You informed Customer of extra Charge for more than 10m of Cable that will be needed?

  • JY GAAN SELF BETAAL

Batteries

  • Batteries Installed?

  • Take Picture of Busbar

  • Take Picture of Pull Fuse Installed

  • Current total Battery Qty

  • Individual Battery Size

  • Battery Name & Type

  • Battery Upgrade

  • How Many Batteries to add

Panels

  • Current Type Of Panels

  • Current Panels Size (Wp Each)

  • Current Amount of Panels

  • Attach Picture of Jobcard stating PV TYPE, SIZE & QTY

  • PV Upgrade?

  • Amount of PV Panels to Be added

  • High roof?

  • Hight Of Roof?

  • Easy Access Via Lower Levels?

  • Cherry Picker or Scaffolding Required

  • Have you Informed Client of an Extra cost for this?

  • JY GAAN SELF BETAAL

  • Roof Type

  • Number of orientations

  • Photo of where panels must be placed

  • PV Cable run to Inverter (20m is included in standard installation)

  • PV cable that requires conduit / trunking

  • Length of conduit / trunking

  • Indicate routing on photo

  • Underground?

  • Length of underground cable

  • Show routing on photo

  • Acknowledge that the client needs to arrange the digging and closing of any required trenching

  • When was original install Done

  • Any Other Info of Installation that should be Known

  • Explain

  • Attach Pictures

Sign off and management review

  • Surveyor Signature

  • Customer Signature

CoC Electrical Work Needed

  • Any other electrical work required

  • Specify

  • Is a prelim inspection and quotation to the client required?

  • Will the CoC electrician need to complete his work prior to installation of solar?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.