Information
-
S/O Number
-
Address
-
Commit date
-
Prepared by:
Next Actions
-
What outside installation method is to be completed?
- 1. Aerial
- 2. Haul
- 3. Surface Mount Cable
- 4. Shallow Trench
- 5. Drill or slot Trench in Concrete
- 6. Hard Surface Trenching
-
Chorus approval required
-
Was a half scope or full scope completed?
-
Type of network?
- Air Blown Fiber Blow
- Fixed Fiber Haul
- Aerial (overhead)
-
Specific skills required?
-
What Skill set required?
- Ruggerdised
- Trenching
- Concrete cutting
- Drill shot required
- Blocked duct under concrete
- Blowing distance greater than 500m
- Outside Boundary remedial
- Other
-
Distance of drill shot? Note: If less than 20m a grundomat can be used.
-
Distance of trenching?
-
Short description of other
-
Short description of what is required
-
Other requirements? I.e TMP, Arborist
- No
- L2 TMP
- Arborist
- Obstruction plans required
- Other
-
What is required?
-
Customer consent granted? Only Written consent is accepted
Customer / Job Details
-
Name
-
Contact
Job instructions
-
Detailed description of works required
-
Add labelled photos using the 'inote HD' app
Health, Safety and Environmental Issues
-
Underfloor access?
-
Ceiling access?
-
Location of ETP?
-
Gas detector required?
-
Dogs on site?
Consents Required
-
Right of way?
-
Multi dwelling unit?
-
Heritage site or Building?
Network
-
Water in chambers?
-
FAT/Flash9/Cabinet location?
-
Distance from boundary to ETP?
Internal information
-
Location of ONT?
-
Location of RGW?
Additional notes
-
Notes
Ultra-Fast Broadband Installation Consent
-
If you are not the person who ordered service (the customer), please confirm that you are authorised to represent the customer.
-
We will carry out the work in accordance with Chorus' End User Terms (available at www.chorus.co.nz/ufb-terms).
More information about how we install fibre is available on our website,
https://www.chorus.co.nz/installing-fibre/fibre-in-your-home-or-business/ufb-installation-easy-as-abc
Outside property consent
-
Hole excavation and trenching?
-
Removal of concrete/tiling/pavement?
-
Installation of pipe(s)?
-
Removal of existing copper line to the house?
-
Others?
-
Clean up: We will leave the property in a clean and tidy state on competition. This does not include reinstatement to the same condition.
Inside property consent
-
Drilling small holes?
-
Cutting holes in walls?
-
Exposed surface wiring?
-
Removal of ceiling tiles?
-
Surface mounted installation and hardware?
-
Others?
Signed consent
-
I confirm that:
- I have seen, read and understood this information and the end user terms and accept those terms; and
- I agree to Chorus undertaking the installation works and method chosen at or on the property; and
- If I am not the owner of the property, I have obtained the consent of the owner for the installation works; and
- I understand that there may be an impact on the operation of burglar and medical alarms, particularly monitored alarms. [Note: check with your alarm provider or telecommunications service provider
- I agree Chorus may share my information it has gathered or holds about me with phone and broadband providers for the purpose of connecting my property to Chorus' network via fibre. -
End user signature:
-
Authorised Chorus technician: