Information
-
Audit Title
-
Audit Title
- Asda H&S Audit
- Tesco H&S Audit
- H+H
- Morrison H&S Audit
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Copies to:
- Directors
- H&S Department
- Nat Challacombe
- Project Manager
Site Information
-
This is a health and safety inspection of you site, in line with HSE and UPlands policies. You will be marked on how well you site has done.
SITE INFORMATION.
-
Contractors on site.
- Dribuild
- Selectrical
- DMC
- Alldec
- WEC
- Online
- Fixtures
- Primo
- G&H
Site set up
-
Is there suitable signage on the gates
-
Are the gates closed (if open manned)
-
Is the access to the gates clear
-
Is the area clean.
-
Is the pedestrian entrance highlighted.
-
Is there safe access to the site pedestrian access
-
Is the pedestrian gate closed and locked.
-
Is the general appearance of the hoarding acceptable.
-
Is the signage fit for purpose?
-
Security Office.
-
Were there any issues identified with the Security Officer?
-
What are the issues?
- Poor appearance
- Listening to radio
- Reading a news paper
- Eating
- Desk untidy
- Security office untidy
-
What was good?
- Professional
- Smart
- Proactive
-
Were you challenged by the security officer?
-
Why not?
- The officer was not there.
- The officer ignored me.
- Didn't respond to me.
-
Are signing bands available.
-
Was the Sign in Register available ?
-
Is the Signing Register up to date?
-
What are the issues?
-
In what way?
Induction room.
-
Are induction labels available?
-
Is the Induction flip chart current?
-
Is URL H&S policy displayed?
-
Is the URL Environmental policy displayed?
-
The following standard information is displayed on the notice boards
- First Aiders
- Compound Fire Plan
- Store Fire Plan
- Traffic Route
- Asbestos Register
- AWOW ver 5
- Waste Champions
-
Are induction forms available and correctly filled out?
-
Please select issues
- No forms available.
- NO CSCS information attached.
- Not signed off by inductor
- Not signed by Inductee
-
Name of Inductor
-
What company did not sign?
- Dribuild
- Selectrical
- DMC
- Alldec
- WEC
- Online
- Fixtures
- Primo
- G&H
Compound
-
What is the condition of the compound?
-
Is the gas cage locked?
-
Is there suitable signage?
Site Toilets
-
Are the toilets fit for purpose? Including hot water stickers, DEB board and hand towels. Is the female toilet uncluttered ?
-
What are the issues?
- No HOT water signs
- Nk DEB board
- No hand towels
- Dirty
- Female toilet cluttered
Office
OFFICE.
-
Are the files in line with URL template?
-
What are the issues ?
- Files are missing
- Files are incomplete.
-
File numbers
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
What files are incomplete ?
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Is there a sink In the office
-
Is the required signage in place?
-
What is missing?
- Drinking water sign
- Hot water warning label.
-
Are all the electrical items PAT tested?
-
Please select an issue.
-
All electrical items MUST be PAT tested with the next 7 days and evidence sent to the H&S department
Files.
-
Has there been a crane lift
-
Is all the paper work correct
-
What is missing or incomplete?
- Lifting plan not complete
- Crane certificates
- RAMS
- The RAMS are not signed
- URL form UHSF not completed.
RAMS
RAMS Review
-
Are the RAMS reviewed correctly?
-
Tap add button to input each RAM not reviewed correctly.
RAM
-
Name of contractor.
- Dribuild
- Selectrical
- DMC
- Alldec
- WEC
- Online
- Fixtures
- Primo
- G&H
-
Name of person carrying out RAM review
-
date of review?
-
Is URL form completed correctly
-
What are the issues
- Not Signed.
- Not completed correctly
- No form attached to RAMS
- 19 point check list not complete.
-
Is the RAM fit for purpose?
-
What are the issues?
- No COSHH
- No Risk assessment t
- Not site specific
- Not in line with URL 10 point check list.
- No method statement
- Not signed by operatives
Permit System
PERMITS
-
Is the permit register up to date?
-
What are the issues?
- Permits not sign off/closed out
- Not completed correctly
- Wrong permit issued
- Permit numbers are used more than once
Site permit audit
-
Tick if operatives are working without a permit.
-
Permit issues.
Issue
-
What type of activity?
- Painting
- Fixtures
- Terrazzo
- Soft flooring
- Electrical
- CCTV
- Alarms
- Shop fitting
- Ground works
- Roof works
- Refrigeration
-
Name of company
- Dribuild
- Selectrical
- DMC
- Alldec
- WEC
- Online
- Fixtures
- Primo
- G&H
-
Name of operative?
-
What type of permit that should have been issued?
- WAH
- HW
- Demo
- Steps/ladder
- Roof access
- Electrical
- Excavation
-
Reason for not having a permit?
- Forgot
- Thought I didn't need one
- Other
-
Reason given.
-
Are Operatives working with a valid permit
-
Has the permits being issued and managed correctly?
-
Permit issues.
Issue
-
What type of activity?
- Painting
- Fixtures
- Terrazzo
- Soft flooring
- Electrical
- CCTV
- Alarms
- Shop fitting
- Ground works
- Roof works
- Refrigeration
-
Name of company
- Dribuild
- Selectrical
- DMC
- Alldec
- WEC
- Online
- Fixtures
- Primo
- G&H
-
Name of operative?
-
Permit issue
Site Walk around
Site walk around Audit.
Segregation of work area.
-
Are the areas segregated from colleagues
-
Segregation issues
Issue
-
What are the issues?
- Colleagues working in area
- Asda aces working without PPE
- No clear boundary
- Material outside the area
-
Has the manager removed the colleagues from the area?
-
Do you want to take a photograph or corrective action?
-
Corrective Action
-
Has the manager moved the materials behind the barriers?
-
Do you want to take a photograph or corrective action?
-
Corrective Action
-
Has the manager created boundaries?
-
Do you want to take a photograph or corrective action?
-
Corrective Action
Wearing of PPE.
-
Are all operatives wearing the correct PPE?
Completion
-
YOU HAVE FAILED YOUR SITE AUDIT, THE NC2 and NC3 MUST BE RECTIFIED AND COMPLETE AS A MATTER OF URGENCY. ALL EVIDENCE MUST BE SENT TO THE H&S DEPARTMENT.
-
The following NC3 were identified:
- Working on site with RAMS
- Working on site dangerously
- No PPE worn on site
- Poor segregation
-
The following NC2's were identified on site:-
-
You have passed your site audit, the following items were identified and need to be closed out within the next 7 days and evidence sent to the H&S department
-
Congratulations you have gained a fantastic score and should be proud of your site..
-
Is the PM available for signature. Tick if available.
-
Project Manager.
-
Must be sign before leaving site
-
Is the Night Manager available for signature. Tick if available.
-
Night Manager.
-
Must be sign before leaving site
-
I can confirm that I have carried out the above inspection.
Site sign off
-
I can confirm the the items mentioned in the above report has been rectified and evidence has been sent to the H&S department.
-