Information

  • Site Name

  • Address / Postcode
  • What three words if applicable

  • Conducted on

  • Prepared by

  • Officer Name(s)

Generator Information

  • Is the officer required to enter live substation?

  • Is the officer substation entry trained?

  • Brief description of the main hazards / risks to the officer based on requirements

  • Requirements of officer

  • Distance of the guard to the substation

Health and Safety

  • Do the guards have adequate temporary welfare? Provisions?

  • Health and Safety Concerns of the site?

  • Is emergency information posted in guards location?

  • Is the guard parked in a safe space if based outside the access gate?

  • Any other health and safety points to be raised?

PPE

  • Is the mandatory PPE e.g. flame retardant overalls / full orange hi vis, safety boots being worn?

Method Statement and Risk Assessment

  • Are guards aware of generic method statements and risk assessments in place for Security on these temporary generator jobs?

  • Has this been passed to head office to chase?

  • Any further comments to add?

  • Comments

  • Site manager/supervisor sig if applicable

  • Security Supervisor / Manager signature

Any further photo evidence?

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.