Information

  • Building

  • Apartment number

  • Conducted on

  • Prepared by

  • Location
  • Inspection completed

Fan Coil Unit

  • Install as per drawing

  • Correct model/ handing

  • Photo of unit

  • Serial number

  • Supply air plenum correct

Ductwork

  • Ductwork installed as per drawing

  • Corners installed and all joints correctly sealed

  • Discharge cowl installed by Yuanda

  • Wall sleeves installed and sealed correctly

Flexible ductwork installed

  • Ductwork sizes correct

  • Flex supported correctly

  • Connections to spigot correct using ties and tape

  • Flex inspected for tears and repaired as required

Toilet exhaust fan

  • Fan installed as per drawing/ air flow correct

  • Speed controller installed

  • Non return damper installed, direction correct

  • Plug base installed by Star, plug connected

  • Fan test carried out, fan operates correctly.

Electrical

  • Interconnect power and control cabling roughed in

  • Wall controller cable roughed in to correct location

  • FCU terminated

  • T/E fan terminated

Refrigeration

  • Pipe work roughed in

  • Insulation correct and joints sealed

  • Pipe work connected to FCU

  • Pressure test completed

  • Test data received

  • Wall penetrations installation correct and sealed as approved

  • Photo of wall penetrations

Condensate drain

  • Drain rough in complete

  • Water test carried out and sign off received

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.