Information
-
Building
-
Apartment number
-
Conducted on
-
Prepared by
-
Location
-
Inspection completed
Fan Coil Unit
-
Install as per drawing
-
Correct model/ handing
-
Photo of unit
-
Serial number
-
Supply air plenum correct
Ductwork
-
Ductwork installed as per drawing
-
Corners installed and all joints correctly sealed
-
Discharge cowl installed by Yuanda
-
Wall sleeves installed and sealed correctly
Flexible ductwork installed
-
Ductwork sizes correct
-
Flex supported correctly
-
Connections to spigot correct using ties and tape
-
Flex inspected for tears and repaired as required
Toilet exhaust fan
-
Fan installed as per drawing/ air flow correct
-
Speed controller installed
-
Non return damper installed, direction correct
-
Plug base installed by Star, plug connected
-
Fan test carried out, fan operates correctly.
Electrical
-
Interconnect power and control cabling roughed in
-
Wall controller cable roughed in to correct location
-
FCU terminated
-
T/E fan terminated
Refrigeration
-
Pipe work roughed in
-
Insulation correct and joints sealed
-
Pipe work connected to FCU
-
Pressure test completed
-
Test data received
-
Wall penetrations installation correct and sealed as approved
-
Photo of wall penetrations
Condensate drain
-
Drain rough in complete
-
Water test carried out and sign off received