Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
AUDIT TIMING (SITE AUDITS REQUIRE BIWEEKLY COMPLETION ON MONDAYS AND THURSDAYS ) to score positive on this question audits must be uploaded on each of these days
-
IS THE AUDIT COMPLETED ON ?
PEOPLE
-
HAVE TOOLBOX TALKS BEEN GIVEN AND SIGNED BY ALL ATTENDING PERSONNEL
-
ARE ALL PERSONNEL SITE AND PROJECT INDUCTED
-
ARE ALL PERSONNEL SIGNED ON TO JSA'S/SWMS
-
ARE ALL PERSONNEL WEARING REQUIRED PPE
-
ARE FIRST AID TRAINED PERSONNEL ON SITE WITH UP TO DATE CERTIFICATE
-
IF PROJECT PERSONNEL ARE NOT TRAINED IN FIRST AID THEN DOES THE BUILDING OWNERS /LANDLORDS/CENTRE MANAGER PROVIDE ONE WITH CONTACT DETAILS
-
IF MANUAL HANDLING IS REQUIRED ARE CORRECT LIFTING TECHNIQUES BEING USED
-
IF HEAVY LIFTING IS REQUIRED IS MECHANIZED ASSISTANCE BEING USED WHERE AVAILABLE
-
Add media
DOCUMENTATION
-
ARE PLANT AND VEHICLES MAINTENANCE RECORDS AVAILABLE
-
IS ALL SAFETY DOCUMENTATION (SWMS, JSA'S ,MSDS, HIGH RISK WORK PERMITS) CURRENT AND SIGNED<br>
-
ARE INCIDENT/ACCIDENT/ NEAR MISS FORMS IN PLACE ,
-
IS THERE AN ELECTRICAL REGISTER/MATRIX (FOR PORTABLE ELECTRICAL ITEMS/TOOLS) IF SO IS IT UP TO DATE ?
-
ARE ALL NECESSARY PERMITS IN PLACE AND UP TO DATE ?
-
ARE SITE EVACUATION PLANS AND PROCEDURES DISPLAYED DETAILING ASSEMBLY POINTS ?
-
IS THE CONSTRUCTION SIGN WITH LICENCE NUMBER AND SITE CONTACT DETAILS DISPLAYED WHERE VISIBLE <br>
-
Add media
EQUIPMENT
-
ARE ALL FIRE EXTINGUISHERS OF APPROPRIATE TYPE AND DATE COMPLIANT ?
-
ARE FIRST KITS AVAILABLE AND FULLY STOCKED ?
-
IF GUARDS IN PLACE ON MACHINERY ARE THEY IN GOOD CONDITION AND USED WHEN MACHINE IS IN OPERATION
-
IS MACHINERY ONLY OPERATED BY TRAINED AND LICENSED<br> COMPETENT PERSONNEL<br>E.G FORKLIFTS , KNUCKLE BOOMS , POWERED TOOLS ETC)
-
ARE ALL WORKING PLATFORMS APPROPRIATE FOR TASK AND COMPLIANT <br>(PLATFORM LADDERS , SCAFFOLDING , SCISSOR LIFTS )
-
Add media
ENVIROMENT
-
IS THE LIGHTING SUFFICIENT FOR THE JOB TO BE DONE SAFELY<br>(INC PORTABLE/TEMPORARY LIGHTS)
-
IS THE AIR QUALITY IN THE WORKING AREA AND SURROUNDING AREAS OK WITH NO EXCESSIVE FUMES DUST OR VAPOURS
-
ARE PERSONNEL ADHERING TO THE NO SMOKING POLICY ?
-
IS CONSTRUCTION NOISE BEING MONITORED AND COMPLIANT WITH LOCAL RESTRICTIONS
-
IF AN ASBESTOS SURVEY WAS CARRIED OUT WAS IT CLEAR /GOOD
-
ARE SURROUNDING CONDITIONS FOR WORK , PLANT AND EQUIPMENT SAFE<br>I.E FLOORS LEVEL, ACCESS, OVERHEAD ,HAZARDS
-
IF A WASTE SEGREGATION POLICY IS IN PLACE IT FOLLOWED ?<br>
-
ARE THE BINS EMPTIED REGULARLY AND INTO AUTHORIZED SKIPS/CONTAINERS ?
-
ARE ALL EMERGENCY EXITS CLEAR AND FREE FROM OBSTACLES AND OBSTRUCTIONS
-
IS SITE SECURE FROM PUBLIC AND UNAUTHORISED PERSONNEL
-
IS ACCESS/EGRESS TO SITE UNRESTRICTED AND CLEAR OF TRIP HAZARDS<br>
-
Add media
ELECTRICAL
-
ARE ALL PORTABLE ELECTRICAL ITEMS TAGGED AND COMPLIANT
-
ARE ALL ELECTRICAL LEADS /GPO'S ROUTED AS SAFELY AS POSSIBLE TO MINIMIZE TRIP HAZARDS AND ALSO NOT AT A HEIGHT WHICH COULD BE CONSIDERED A HAZARD
-
ARE ALL ELECTRICAL LEADS IN A GOOD UNDAMAGED CONDITION
-
ARE ALL APPLIANCES/ TOOLS POWERED THROUGH A RCD EQUIPPED GPO
-
ARE LOCK OUT TAG OUT PROCEDURES IN PLACE AND BEING FOLLOWED ?
-
ARE PORTABLE RCD'S CHECKED DAILY
-
Add media
NOTES AND COMMENTS
SIGNED OFF BY SITE/PROJECT MANAGER
-
Add signature