Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Investigation
-
Incidental details
-
Date of Incident and time
-
Depot/Office
-
Reported Date and time
-
Individuals Involved
-
Reported By
-
Contact number
-
Team Manager
-
Senior Manager
-
Safety Rep Included in the Investigation
-
Other person(s) Involved
-
Location (address details, including post code)
Investigation details
-
undefined
Incident details
-
Site Specific Risk Assessment Carried out?
-
Details of work activity being undertaken
-
Did the Manager attend site on the day?
-
Other Utility Informed?
-
Name of Other Utility
-
Who damaged the cable/utility?
-
Description of Incident
-
What occurred when the cable/utility was struck?
-
- Fire
-
- Flash
-
- Explosion
-
- Bang
-
Details of any injury or medical treatment received (if applicable)
-
Did this have any impact on the environment?
-
What type of utility was damaged (LV, HV, service, main etc)?
-
What was it damaged by?
-
Was the utility in footpath, carriageway or private?
-
Were Utility Plans available, read and understood?
-
Was the Cat and Genny used in all three modes?
-
Was Cat 4 used?
-
If so has embedded information been interrogated by a responsible Manager?
-
Were rechecks carried out with the Cat at different levels? (If so, rechecking with the Cat was carried out every mm)
-
Has the Cat and Genny been tested on site?
-
Was an air lance available?
-
Was an air lance used?
-
If an air lance wasn't used, please detail why not
-
Were conditions / ground type suitable for the air lance to be used?
-
Did the Team rely on other people's markings?
-
Was the cable/utility located and marked?
-
Was ground penetrated within 250mm of marked indication?
-
Were Safe Digging Practices being used near known plant?
-
Was Mechanical Plant used within 500mm?
-
Was Plant used as a step to exit hole?
-
Were Trial Holes used to physically locate cable?
-
EQUIPMENT LIST:
-
CAT (Locator)
-
GENNY (Transmitter)
-
Connection Cable (Clip/Magnet)
-
Ground Cable Reel
-
Ground Stake
-
Signal Clamp
-
Plug Connector
-
Has the Plant & Equipment Monthly Checks Sheet been completed? *If required, team manager to order
Investigation findings
-
undefined
Cause and conclusion
-
IMMEDIATE CAUSE: (simply what caused the Incident/Injury) e.g. cable struck with shovel, graft, fork or falling object whilst hand digging
-
undefined
-
CONCLUSION:
-
undefined
-
Include whether the damage was due to Site Conditions/Plant & Equipment/Procedural or Human Behaviour
-
What procedures were used/supposed to be used In this activity?
-
Appendix
Appendix
-
Is a risk assessment included?
-
Is there additional information not covered in the investigation?
-
Is the information in the document purely factual?