CONFIRMATION OF WORK REQUIREMENTS
-
Project No.
-
Project Title:
-
Client:
-
Weld Procedures (V-):
- 001
- 002
- 003
- 004
- 005
- 006
- 007
- 008
-
Drawings (enter no., revision, issue date & title):
-
Work planned for completion at:
-
Materials:
-
Consumables Batch Test Required?
-
NDT Required?
-
Surface finish required?
-
Third-party inspection required?
-
Details of material specifications:
-
Project-technical review completed?
-
Additional comments/actions:
-
Completed by:
-
Date:
-
Issued to:
INSTRUCTION & MATERIAL ISSUE
INSTRUCTION & DRAWINGS ISSUE
-
Instruction and drawings issued by:
-
Signed:
-
Date:
INSTRUCTION & DRAWINGS RECEIPT:
-
Instruction and drawings received by:
-
Signed:
-
Date:
-
Instructions & drawings understood:
MATERIALS ISSUE
-
Materials issued by:
-
Welding Rods - Batch/Lot No:
-
Signed:
-
Date:
MATERIALS RECEIPT
-
Materials received by:
-
Signed:
-
Date:
-
Comments:
WORK PROGRESS INSPECTIONS
MATERIAL INSPECTION
-
Fitter completed
-
RWC completed & satisfactory
-
RWC signature
-
RWC date
-
3rd party completed & satisfactory
-
3rd party signature
-
3rd party date
WELD JOINTS SET-UP
-
Fitter completed
-
RWC completed & satisfactory
-
RWC signature
-
RWC date
-
3rd party completed & satisfactory
-
3rd party signature
-
3rd party date
DIMENSIONAL CHECKS
-
Fitter completed
-
RWC completed & satisfactory
-
RWC signature
-
RWC date
-
3rd party completed and satisfactory
-
3rd party signature
-
3rd party date
COMPLETED WELDS
-
Fitter completed
-
RWC completed & satisfactory
-
RWC signature
-
RWC date
-
3rd party completed & satisfactory
-
-
3rd party signature
-
3rd party date
PRESSURE/LOAD TESTING
-
Fitter completed
-
RWC completed & satisfactory
-
RWC signature
-
RWC date
-
3rd party completed & satisfactory
-
3rd party signature
-
3rd party date
SURFACE FINISHING
-
Fitter completed
-
RWC completed & satisfactory
-
RWC signature
-
RWC date
-
3rd party completed & satisfactory
-
3rd party signature
-
3rd party date
NDT
-
Fitter completed
-
RWC completed & satisfactory
-
RWC signature
-
RWC date
-
3rd party completed & satisfactory
-
3rd party signature
-
3rd party date
LOCATION OF TEMPORARY ATTACHMENTS
-
Temporary attachments used?
WORK COMPLETION
-
All work completed?
-
Comments/photos:
-
Weld set No.s
-
Are there any surplus materials?
-
Details/photos:
-
Storage location of surplus materials:
-
3rd party inspections conducted?
-
Comments:
FINAL CHECKS
-
Visual Inspection
-
Comments/photos:
-
Weld repairs required?
-
Details:
-
Action required:
-
Nonconformity Log entry (row number)
-
NDT completed and passed?
-
Reports filed?
-
Details:
-
Action required:
-
Pressure testing completed and passed?
-
Reports filed?
-
Details:
-
Actions required:
-
Surface finish completed and passed?
-
Reports filed?
-
Details:
-
Actions required:
-
Ready for dispatch?
-
Goods/equipment sealed/packed/protected for transit?
-
Goods/equipment loaded and secured for transit?
-
Delivery note prepared & issued?
-
Delivery completed?
-
Delivery note filed?
-
Work Instruction completed?
-
Submitted to office by:
-
Signature:
-
Date:
OFFICE REVIEW
-
All test & conformity documents filed?
-
Handover Certificate issued?
-
Declaration of Performance (CE/UKCA) issued?
-
Job pack issued?
-
Completed Workshop Instruction saved to job file?
-
Signed:
-
Date: