Title Page
-
Conducted on
-
Prepared by
-
Location
Site Information
-
Client
-
Project Reference
-
Date
-
Address
-
Have as built drawings been provided?
-
Build up of waterproofing
-
Build up above waterproofing
H&S
-
Fall protection.
-
Is safe access available
-
Who is providing safe access?
-
Site Requirements? eg. PPE, CSCS card etc
Inspection
Internal Areas
-
Is the leak 'Live'
-
How long does is take once rain starts to leak?
-
is there a clear path for the trace cable?
-
Can a path be made any another way?
-
Photos of internal water ingress
-
Observations
-
Mark up floor plan with leak locations
-
How much cable do we need for the tracer?
-
Photos of the planned tracer cable path
External Areas
-
Water supply at BLD Location
-
Will provision be made for the BLD
-
Photos of area where BLD is required
-
Observations
-
Photo of overburden
-
Location of outlets - mark up floor plan
-
Lightning protection? - mark up floor plan and take photos
-
Add media