Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

CLEARANCE REQUEST

  • Was the Clearance Request/LOTO form used?

  • Was the Clearance verbally requested?

CLEARANCE PREP

  • Was the Clearance/LOTO produced by Red Tag Pro?

  • Was the clearance/LOTO form hand written?

CLEARANCE FORM

  • Was the issuing department designated?

  • Was the issuing "TO" line completed?

  • Was the clearance number on the form?

  • Clearance number:

  • Was the equipment name on the clearance form?

  • Were there any special comments noted?

  • Was the "Clearance Issued By" line filled out?

  • Was the "Clearance Issued Date" line filled out?

  • Was the "Clearance Issued Time" line filled out?

  • Was the "Clearance Accepted By" line filled out?

  • Was the "Clearance Accepted Date & Time" line filled out?

  • Was the "Clearance Released for Corrective Action" line filled out?

CLEARANCE FORM CONTINUED

  • Was the "Clearance Accepted After Corrective Action" line filled out?

  • Was the "Tested/Tried/Vented/Depressurized Where" line filled out?

  • Was the "Tested/Tried/Vented/Depressurized Date/Time" line filled out?

  • Was the "Tested/Tried/Vented/Depressurized How" line filled out?

  • Was the "Clearance Released By" line filled signed?

  • Was the "Clearance Released by Date/Time" line filled out?

  • Was the "SPCC Tags Released By" line filled signed?

  • Was the "SPCC Tags Released By Date & Time" lines filled out?

  • Was the "Tags Picked Up & Equipment Made Ready for Operations By" line filled signed?

  • Was the"# of Grounds Placed" line signed?

  • Was the "# of Grounds Placed By" line signed?

  • Was the "# of Grounds Placed Date & Time" lines signed?

  • Was the "# of Grounds Removed" line filled out?

  • Was the "# of Grounds Removed by" line signed?

  • Was the "# of Grounds Removed Date & Time" lines filled out?

  • Was the "Device Name & Location" line filled out?

  • Was the "Device #" line filled out?

  • Was the "HZD" line filled out?

  • Was the "Lock" line filled out?

  • Was the "Tags Placed by" line filled out?

  • Was the "Red" line filled out?

  • Was the "Striped" line filled out?

  • Was the "Test/Try by" line filled out?

  • Was the Supplemental Sheet marked YES or NO?

TAGS

  • Were striped tags used?

  • Were Red Tags used?

  • How many Striped Tags were used?

  • undefined

  • How many Red Tags were used?

  • undefined

  • Do the number on the "Clearance" number and "Clearance No." on the tag match?

  • Was the I/A line signed?

  • Was the "TAG HUNG BY" line signed?

  • Was the "Equipment Name line" filled out?

  • Does the "Equipment Name line" match the clearance?

  • Was the "ID NO." Line filled out?

  • Was the "DEPT" Line filled out?

  • Does the "DEPT" line match that on the "TO" line on the clearance form?

  • Does the 1st tab on the tag match that of the "Clearance No." on the tag?

  • Does the 2nd tab on the tag match that of the "Clearance No." on the tag?

LOCKS

  • Number of Red Equipment locks used?

  • Were the lock(s) placed in the proper area(s)?

SUPPLEMENTAL SHEET

  • Was a Supplement Sheet used?

  • Was the Issuing Department designated?

  • Was the Issuing "TO" line completed?

  • Was the clearance number on the form?

  • Was the equipment name on the clearance form?

  • How many striped tags were used?

  • How many red tags were used?

Signatures

  • Select date

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.