1. Site Risk Management
-
Is a relevant SWMS available and a Site Risk Assessment (JSA) completed for the work?
-
Has the JSA been signed and dated daily and the SWMS identified?
-
Have sub-contractors (e.g. Traffic Management) been inducted onto the site and signed onto the JSA?
-
Has the Traffic/Pedestrian Management Plan been identified/created and available on site and documented on the JSA?
-
Overall, is the JSA adequate for the worksite?
2. Personnel Protective Equipment
-
Is approved PPE clothing worn and is wrist to ankle coverage maintained?
-
Is approved safety footwear worn?
-
Is other appropriate PPE utilised and in good condition? (e.g. hard hats, hearing and eye protection)?
3. Traffic and Pedestrian Management
-
Has the appropriate Traffic and Pedestrian Management Plan been identified, and does it meet all requirements?
-
Does the actual traffic/pedestrian layout reflect the Traffic/Pedestrian Management Plan?
-
Is pedestrian traffic safely controlled through the worksite?
-
Are traffic signs and devices legible and undamaged?
-
Are suitable barriers provided to protect the public from the work site?
-
Where site is to be left overnight, are adequate protection measures, lighting and night guidance provided?
-
Are traffic management personnel wearing high visibility PPE?
4. Forms/Documentation
-
Is there a job file available on site?
-
Does the job file contain a daily job sheet / work instruction?
-
Does the job file contain an Application for EAP / HV Suppression?
5. Access Authorities
-
Is there a permit on issue for this work and are all sections completed correctly?
-
Is suppression required and if yes, has an Application for HV Suppression been made?
6. Skills and Competency
-
Do all personnel have Passports on site?
-
Is all training and are all authorisations current for the functional role of the Passport holder?
-
Are all personnel licensed/registered for their functional role?
7. Vehicles/Plant
-
Are all plant operators licensed as required?
-
Are logbooks available for all plant on site and have they been maintained appropriately?
-
Are EWPs within the electrical test due date?
-
Are EWPs within the weight test due date?
-
Have pre-start checklists been completed?
-
Are all vehicles on site registered?
-
Are all vehicles/plant within their service range?
-
What is the general condition of the vehicles/plant (cleanliness)?
-
Is all equipment carried on vehicles adequately secured?
-
Is there appropriate identification on contractor vehicles?
8. First Aid
-
Is there an intact First Aid kit?
-
Is the kits location marked on the vehicle?
-
Do the contents appear to be complete, in good condition and within expiry dates
9. Tools and Equipment: Testing and Condition
-
Are sticks and hydraulic saws, in test date (where required)?
-
Are other pieces of equipment e.g. petrol chainsaws operational and in good working order?
10. Environment and Hazardous Goods
-
Are there any chemicals in use and is there a MSDS available for the chemical??
-
Are any hazardous materials and dangerous goods separately stored and labelled?
-
Are environmental risks identified and controlled in the JSA?
-
Are there effective erosion and/or sediment controls in place?
-
Are there any control measures to manage spills and leaks? (e.g. spill kit)
-
Is Bushfire mitigation equipment available? (e.g. knapsack, rakes permit)
11. Working at Heights
-
Is the correct fall prevention equipment used?
-
Are harnesses, pole belts, lanyards and any other fall prevention equipment in test date?
-
Are Rescue Kits available, in test and in position?
-
Are ladders in use in an adequate condition?
-
Are ladders in use setup correctly?
12. Worksite/Work Practices
-
Effective Safety Observers in place?
-
Plant and equipment appropriately set up? (e.g. trucks earthed / bonded, outriggers in use, etc.)
-
Are Safe Approach Distances maintained?
-
Do the crew members have knowledge of cutting cycles/programs, required vegetation clearances and regrowth allowances?
-
Are final cuts in line with AS 4373 Pruning of amenity trees?
-
Are the crew removing unsuitable trees where appropriate and are stumps cut to ground level and poisoned?
-
Are crew aware of process for trees that they are unable to clear to compliance?
-
Have the crew left the work site clean tidy and safe?
-
Is the site tidy with no obvious tripping or other hazards?
-
Comments
-
Overall Audit Rating
- 1
- 1.5
- 2
- 2.5
- 3
- 3.5
- 4
- 4.5
- 5
- 5.5
- 6
- 6.5
- 7
- 7.5
- 8
- 8.5
- 9
- 9.5
- 10