Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Ventilation

  • Has the Trickle vents been installed correctly

  • Has the Extractor been fitted correctly

  • Has there been any damage to the window during Trickle vent install

  • Is the customer happy with the install

Post Install

  • Does the Ventilation have any damage? (Scratches, dents etc)

  • Is the Ventilation level?

Inspection Review

  • Has the customer raised a complaint from the installation?

  • Are you satisfied as the inspector with the quality?

  • Please add any further notes or evidence as required.

  • Did the operative conduct a pre-installation walkthrough prior to commencing works

  • Did the operative explain about the noise levels before work started?

  • Were there suitable floor covering used to offer protection during installation?

  • Was the team polite and professional throughout the install?

  • Were all work areas kept tidy during and on completion of the install?

  • Would you like to provide any further feedback on your experience of the install?

  • Any other issues?

Final Comments

  • Review of Inspection

  • Person completing the Audit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.