Title Page

  • Prepared by

  • Park Home Owners Name

  • Conducted on

  • Location
  • Property type

  • Number of Bedrooms

  • Fuel Type

  • Boiler Make

  • Boiler Model

  • Size of Park Home SQM

  • Is adequate underfloor ventilation present as stated in the minimum requirements guidelines ?

  • Skirt Material

  • Will the design need to incorporate the installation of underfloor ventilation

Under The Park Home

  • Number of Jacks (16 for double, 8 for Single)

  • How Many additional Jacks are required?

  • Current Number of Hatches in situ

  • Is there a minimum of two accessible hatches, and are they situated opposite sides of the axle stands?

  • What is the condition of the Jacks

  • Are the hatches accessible

  • Will an access hatch need to be installed to complete the survey and installation

  • Is the whole of the underfloor accessible

  • Bottom of chassis to base of Park home (high point) ?

  • bottom of chassis to base of park home (low point) ?

  • Depth of Timber Joist timber joist to base of Park Home?

  • Are there any Dangers Visible? this may include evidence of rodent activity, leaking pipes, exposed wiring

  • Please state the dangers

  • Is there any pipe work that will require lagging as part of the installation?

  • What size pipe is present

  • How much Pipe lagging will be required?

  • Does the Gas Pipe run under the floor?

  • What is The base made from

  • Is there pre existing insulation present

  • What is the condition of the insulation

  • Condition of Chassis

Ventilation Strategy

  • Does the Property have adequate Combustion Ventilation in place?

  • Please State the reason for the Additional Ventilation in the notes and select the location of the required Combustion Ventilation.

  • Does the Property have Adequate Mechanical Extraction and ventilation already in place in all wet rooms ?

  • Mechanical Ventilation Stratergy

  • Does the Property have adequate background ventilation by means of window trickle ventilation in habitable rooms?

  • Background Ventilation Strategy

  • Does the Property have adequate background ventilation by means of Door undercuts of at least 7 600 mm2 beneath all internal doors, above the floor finish, to allow air to move through the dwelling in habitable rooms? ( approx 7-10mm gap)

  • Door Undercut Ventilation Strategy

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.