Information

  • Location
  • Conducted on

  • Prepared by

  • Person/s consulted during the inspection.

1 Use this checklist to carry out an inspection of a site or area. 2 All comments must define what is to be done , by when and be allocated to a person.

INDUCTION

  • All Inductions complete for onsite personnel ?

  • Sign in completed for for contractors and visitors currently on site ?

Pre-Start checks and Risk Assessments

  • Take 5s are being undertaken ?

  • Hazard identification is evident and appropriate controls are in place eg Correct PPE , Signs , Cones / Cone Bars , Barriers ?

  • Risk Register on site maintained and reviewed to ensure all tasks are captured ?

  • Equipment & Vehicle pre-inspection checklist completed ?

  • JSEA completed and Signed on by all workers demonstrating hierarchy of controls ?

  • Work place set up as per JSEA ?

  • Workers are following JSEA ?

Test and TAg

  • Electrical equipment inspected and tagged , list the date of last inspection ?

  • Are there any damaged leads or electrical equipment ? Are they quarantined ?

  • Power marked in orange

  • Are all electrical distribution boards securely locked at all time ?

  • Are all machines guarded and in safe working condition as per the relevant New Zealand standard ?

  • Emergency stop accessible and in working order ?

  • All lifting and working at heights equipment is listed on a register and is currently within the required inspection time-frame ? list the date of the last inspection List Date in Comments Section

  • Safe working load noted on plant used for lifting onsite and current certification up to date ( plant can mean any lift points, mezzanine floors, pallet racks and overhead, cranes. ) list last date of inspection in comments section.

Isolation's - Lock out

  • LOTO Process observed<br>- Permit understood, completed and signed on<br>- Personnel locking out has been trained<br>- Locks are locked<br>

Personal protective equipment

  • correct PPE provided and PPE Register maintained.

  • PPE worn correctly and in good condition.

  • Is PPE signage clearly visible upon entry to the site and work areas

House Keeping

  • Are floors, walkways and under benches clean and tidy

  • Are floor coverings in good condition

  • Are there any unattended pits & unprotected pits present in the work area

  • All Hand rails/guardrails are in good condition and comply with safety requirements

  • Storeroom in neat and tidy with all parts in correct location

  • All vehicles have been inspected in the month, List date of last inspection in the comments section

  • Tools , Vehicles, Plant and equipment are stored / parked appropriately

  • Hatches and lids are locked / secured from unauthorised entry

  • Grounds and fences are tidy

Traffic management

  • Image of the TMP Signage and setup on site.

  • The CAR NOTICE is on site.

  • CAR IS VALID FOR THE SITE

  • TMP. Is set up according to those TMP approved in the CAR.

  • STMS CONTACT details recorded on site.

  • Equipment and plant setup inside the TMP zones?

Sign off Audit

  • Contractor/Team Leaders signature

  • Site Supervisors signature.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.