Information
-
Client
-
QVIN
-
Engineer or Sub Contractor Name and Company
-
Add location
-
Site Location - eg 5th Floor East Core .
-
Prepared by
-
Conducted on
Methodology
-
Visual Inspection Methodology
The Purpose of this inspection is to visually ascertain if all the equipment in the area documented has been installed to the correct standards.
When inspecting the installation please review against the current BS / ISO standards, project specifications drawings, instructions / acceptance criteria and manufacturer instructions.
Key Areas to inspect:
Containment - Installed to the current British Standards and in line with the project specification and drawings
Cabling - Segregated, secured, terminated and labelled
Hardware – level, correct fixings used, terminated and labelled
The final document should be able to tell the reviewer when and who inspected the installation. What specific area and equipment they inspected and if it met the required standards.
If the standards were not met the reviewer should be able to easily identify what areas have fallen below the required standard and photo evidence of this.
AUDIT
CONTAINMENT
-
Are you visually inspecting containment?
-
Please select the containment being inspected.
- Plastic Conduit
- Metal Conduit
- Plastic Trunking
- Metal Trunking
- Metal Tray
-
Has the containment in the area being inspected been installed to meet the current BS / ISO standards, project specifications drawings & instructions / acceptance criteria?
-
List the elements of containment to be re installed to meet the standards required.
-
Please photograph areas of containment that fall below the accepted standards.
-
Is the area being inspected complete?
CABLING
-
Are you visually inspecting cabling?
-
Please select the types of cables being inspected.
- CCTV
- Network
- Access Control
- Fire
- IDS
- PIDS
- Intercom
-
Has the cabling in the area being inspected been installed to meet the current BS / ISO standards, project specifications drawings & instructions / acceptance criteria?
-
List the elements of cabling to be re installed to meet the standards required.
-
Please photograph areas of cabling that fall below the accepted standards.
-
Is the area being inspected complete?
HARDWARE
-
Are you visually inspecting hardware?
-
Please select the types of hardware being inspected.
- CCTV Camera
- Door Hardware
- Access Control Panel
- PSU
- Intercom Handset
- Intercom Monitor
- Intercom Entrance Panel
- Network Socket
- Network Switch
- Server
- Workstation
- Fire Detector
- Fire Sounder
- Fire MCP
- Fire Panel
- Fire Relay (FAI)
- IDS Detector
- IDS Panel
- IDS Door Contact
- PIDS Panel
-
Has the hardware in the area being inspected been installed to meet the current BS / ISO standards, project specifications drawings & instructions / acceptance criteria?
-
List the elements of hardware to be re installed to meet the standards required.
-
Please photograph areas of hardware that fall below the accepted standards.
-
Are there any additional follow up actions from this audit?
-
Is the area being inspected complete?
AUDIT COMPLETION
-
Is there any actions remaining that need to be addressed?
-
Auditor Signature