Title Page

  • Job Number

  • Site Address

  • Conducted on

  • Installed by

  • Lockbox works completed?

  • Please provide details

  • Please provide photos of the lockbox and IRS cab including the link cables after complete works. (Please show cabinet and link cables)

  • Has the socket been installed?

  • Please provide details

  • Please provide photos of the VM socket before and after install.

  • Note that the expected VM signal levels at the socket is between -5db and +5db on the VM meters or 55db and 65db on the TV/Sat analysers

  • Was the socket tested and passed?

  • Please provide details

  • Is there sufficient signal at the socket?

  • Please provide details of the issues found.

  • Please provide pictures of the test on meter screen.

  • Test notes if fail

  • By signing the below, I confirm the work has been carried out to a satisfactory standard.

  • Residents Name

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.