Title Page
-
Job Number
-
Site Address
-
Conducted on
-
Installed by
-
Lockbox works completed?
-
Please provide details
-
Please provide photos of the lockbox and IRS cab including the link cables after complete works. (Please show cabinet and link cables)
-
Has the socket been installed?
-
Please provide details
-
Please provide photos of the VM socket before and after install.
-
Note that the expected VM signal levels at the socket is between -5db and +5db on the VM meters or 55db and 65db on the TV/Sat analysers
-
Was the socket tested and passed?
-
Please provide details
-
Is there sufficient signal at the socket?
-
Please provide details of the issues found.
-
Please provide pictures of the test on meter screen.
-
Test notes if fail
-
By signing the below, I confirm the work has been carried out to a satisfactory standard.
-
Residents Name
-
Add signature