Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Environmental Basics - 500 points per question.

  • Does the site have a current environmental risk assessment less than 2 years old . <br><br>Partial if the risk register is under 3 years old.

  • Has the site developed a site based HSE plan for the current year.<br>Partial if the plan is in preparation <br>

  • Has the site established a HSE meeting or this is covered as an item in a regular site management or production meeting ?<br>Partial if meeting is infrequent

  • Has the site developed a HSE site house keeping checklist which includes all of the key risks from the site risk register,<br>Partial if this contains many of the key environmental risks but not all

  • Are house keeping check sheets conducted weekly . Partial for fortnightly or irregular implementation

  • Has the site achieved its environmental toolbox talk target for the past 6 months. <br>Partial if this has been achieved for the past 3 months

  • Does the site have a HSE communications board displaying the Visy policies , toolbox talks and recent SEOs and environmental alerts which is readily accessible to employees ?

  • Do all bunded areas comply with the Visy bundling guidelines <br>Reference HSE form 1205

  • Are there adequate spill kits and are these located in all areas where they are needed ?

  • Are MSDS' up to date as well as site manifests if prescribed quantities are exceeded . <br>Partial if this is substantially complied with

Environmental Basics Deductions

  • 1.Is there any significant environmental aspect not on the site risk register ?<br><br>Significance requires an aspect to be an abnormal occurrence, compliance issue or have a risk ranking of greater than 7

  • 2. Is the any significant environmental aspect not on the site risk register ?<br><br>Significance requires the aspect to be an abnormal occurrence , compliance issue or have a risk ranking greater than 7

  • 3. Is there any significant environmental aspect not on the site risk register ? <br><br>Significance requires the aspect to be an abnormal occurrence, a compliance issue or have a risk ranking greater than 7

  • Are there any inappropriate materials stored in bunded areas or hazardous substances stored outside of designated bunded areas ? <br><br>Suppliers and pallets may be combustible and these take up bund capacity resulting in non compliance with design volumes

  • Is there evidence of spill kits being used for waste disposal or depleted of spill materials ?

  • Has the site received any fines, enforcement notices or justified community complaints ?

  • Have all sites utilities data reports been submitted to enable Visy to prepared its annual environmental accounts.<br>This is an important regulatory requirement

Environmental Best Practice- 300 points per question

  • Has the site completed a storm water risk plan in accordance with HSE procedure 1205<br>Reference: HSE procedure 1205 requires catchments with different levels of risk to be included as separate aspects on the site environmental risk register .

  • Are all storm water drains marked in accordance with HSE guidelines ?<br>Partial compliance would equate to most but not all drains <br>Drains which are hard to mark due to traffic removing paint may be exempted

  • Are there clearly marked smoking areas with butt bins ?

  • Are any noise hot spots marked and signed to alert night shift staff?<br>Note: if there are no night time noise issues score as compliant

  • Regarding the manufacturing operations . Are there adequate recycling and general skips and bins in close proximity to the points of waste generation ?

  • Are waste bins appropriately and adequately signed to support usage and proper waste segregation ?

  • Are appropriately labelled bins provided for each type of regulated / prescribed/ hazardous waste. <br>In considering this look at bulk sludges , containers , liquids and oils as well as rags and maintenance wastes . <br>Signage should support bin or storage area usage .

  • Does the site have an emergency plan appropriate for the identified risks which has been reviewed in the past 12 months . <br>Site can score partial if the plan is adequate but has not been reviewed in the past 2 years <br>Reference : HSE Procedure 503

  • Are all items of significant environmental equipment included in the site maintenance plan and adequately maintained. Are checks included in weekly housekeeping check sheets ?<br>Note: if this is not applicable score as compliant

  • Are litter control provisions adequate for the nature of the site risks or not required ?

Environmental Best Practice Deductions

  • Is there any evidence of either cigarette butt litter or other site contamination at the site?

  • Has the site had spills or emergency incidents in the past 12 months

  • Is there evidence of contamination of general waste bins , recycling bins or regulated / hazardous industrial waste bins ?

  • Is there any evidence of litter beyond the site boundary including inside externally draining storm water drains?

  • Is there evidence that required waste records such as regulated waste certificates have not been forwarded as required or copies retained at the site ?

Environmental Excellence- 200 points per question Compliant responses would be those applying across all office area or significant resource usage and partial compliance would be of a narrower scope

  • Green Office: Site provides paper recycling throughout office areas ?

  • Green Office: commingled recycling facilities are available to offices and kitchens

  • Green Office: printer cartridge recycling is provided to all of the site ( compliant ) or office only (partial )

  • Green Office: other recycling facilities are provided .<br>This may include organics/ food , mobile phones , office equipment.<br>Alternatively this question can consider by office supplies with recycled content - partial one example and complaint if two.

  • Green Office: Offices and kitchens are adequately signed to support effective recycling

  • Site has carried out programs to reduce water use in the past 2 years . <br>This can be based on investments made.<br>Site awareness and signage is partial compliance .<br>Evidence can be based on measured reductions in annual resource accounts <br>If water usage is not material site can score partial and complaint if awareness information is displayed

  • Site has conducted programs to reduce energy in the past two years . <br>Evidence may include expenditure or reductions in annual resource accounts <br>Site awareness and signage is deemed to be partial compliance

  • Site has conducted programs in the past two years to reduce general waste quantities . <br>Toolbox talks band awareness are deemed partial compliance <br>Recycling sites are deemed to comply .

  • Site has conducted cleaner production programs to reduce industrial regulated waste in the last two years .<br>This may include weight reduction by dewatering .<br>Sites with no regulated waste can be deemed complaint

  • X factor . Site participates in voluntary environmental initiatives such as recycling week , earth hour or participates in council or school site tours . Site has Implemented environmental initiatives which have not been scored above .

  • Comment and recommendations

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.