Title Page
-
Document No.
-
Conducted on
-
Prepared by
-
Pre Installation Photo - Take Photo upon arrival
-
REWORK REQUIRED
-
REASON for REINSTALL or REPLACEMENT or INSTALL
-
EXISTING DEVICE ASSET TAG No.
Device Details
-
MARK ID
-
BIM ID
-
ROOM NUMBER
-
SECTOR
-
Data Point Id
-
VISIONSTREAM LOD 400 Drawing & Revision Number
-
VISIONSTREAM WE- 020 & REVISION
-
Device Type
-
Make
- AIR-CAP-3702I-Z-K9
- AIR-CAP-3702E-Z-K9
- AIR-CAP-1532I-Z-K9
- AIR-CAP-1532E-Z-K9
- ALR-9650
- IF-B240B
- INF-B246
- INF-B240C
- INF-B240U
- REC-A-155
-
Model
Captured Data
-
Device Serial Number
-
Device Mac Address
-
WSSI Serial Number
-
Asset Tag Number
Quality Checklist
-
Device is fitted in correct location
-
Device alignment and orientation is correct
-
Device is fitted in accordance with an approved installation drawing
-
Device is fitted using correct anchors for installation variant
-
Device is fitted using correct screws for installation variant
-
Device is fitted using correct mounting bracket for installation variant
-
Fly Lead is installed
-
Fly lead is plugged in
-
Fly lead is not lying on the ceiling
-
Fly lead correctly supported above ceiling
-
Fly lead is connected to correct data outlet
-
Asset tag is fitted
-
Asset tag details recorded
-
Area left clean and tidy
-
Ceiling or wall is left clean and undamaged
-
VOC content used and quantity recorded
-
Silicon Used
-
Liquid Nails used
-
NAME
-
Contract Company
-
POST Installation photo