Information

  • CSA

  • Job ID

  • Job Source

  • Address

  • Audit date

  • Auditor

  • Auditee

2.000 Handover & collateral delivered to Chorus

  • 2.011 Inventory database updated

4.000 Code

  • 4.004 Correct Statement of works codes used

6.000 Work areas and safety

  • 6.001 Personal and site safety procedures observed

  • 6.002 Hazards identified and recorded - worksite audit form completed, hazard notices in place

  • 6.003 TMP provided

  • 6.004 Services located

  • 6.005 Power and gas clearances correct

  • 6.006 Gas detector- within current calibration certificate

  • 6.007 Gas detector - measures for oxygen, flammable,carbon monoxide (and hydrogen sulphide in volcanic areas)

  • 6.008 Network security correct (exchange)

  • 6.009 Joint chamber/manhole lids closed and secure

  • 6.012 Temporary work clearly labelled and contains name, contact details, job ID of person involved

  • 6.014 Any defects to existing network outside of scope of project referred to be rectified in the future

11.000 OFDF & exchange fibre

  • 11.002 OFDF hardware secure, OFDF drawer, cable tough, guides, rack

  • 11.003 Network labelling correct at OFDF (OFDF designation, jumper to/from label, data card in I, Q and L drawers)

  • 11.004 Optical cables and cords adequately managed within racks and shelves

  • 11.007 30mm bend radius unconditionally observed at all locations

  • 11.010 Protective caps on all unterminated connectors

  • 11.011 Connectors cleaned and verified with fibre inspection probe

  • 11.012 Laser safety labels (1M safety) at OFDF (inside and front panel)

  • 11.013 No fibre task waste, all optical (glass) ends safety contained

  • 11.014 Access OFDF patch cords routed within mandrels. Excess length stored at AOFDF end

  • 11.015 Access OFDF passive devices within OCM shelf, all unused ports capped

  • 11.021 Log completed

  • 11.023 OCM shelf data card filled out correctly with drawer ID and fibre number

25.000 Poles

  • 25.010 Pole safe to climb (hammer, probe,dig)

  • 25.012 Plant positioned correctly and safely, plant clearances correct

  • 25.014 Unsafe poles labelled/marked for replacement/7 days

  • 25.016 Deeded poles shown in NetMAP pole editor

  • 25.017 All tagged poles in NetMAP

38.000 UFB fibre flexibility point (FFP)

  • 38.006 Distribution frame: data card inside of drawer

  • 38.017 All unused connectors capped

  • 38.027 Managed via mandrels/Velcro ties used

  • 38.029 No fibre or task waste, all optical (glass) ends safely contained

  • 38.030 Data card complete in pencil. ABF - micro duct number, splitter ID and splitter leg. FF - Splitter ID and splitter leg

  • 38.033 Allocated tube used - EPFU routed correctly, from allocated tube, over mandrel or via UMS backing board to correct tray position

  • 38.034 Fibre secured in tube with strain bung

  • 38.035 Allocated splitter leg identified and routed over mandrel or via UMS backing board into correct tray position

  • 38.036 FIP both LC connectors prior to connection

  • 38.037 Minimum bend radius maintained when drawers opened or closed

39.000 Aerial terminal/OFDC

  • 39.004 Terminal lid secure

  • 39.006 Lead-in entry correct

  • 39.013 Network labelling in place to suit requirments

  • 39.015 Flexi pipe secured directly below terminal (galv saddle on wooden poles)

  • 39.017 20mm or 32mm conduit secured to pole (wooden - galv saddles for white PVC pipe, plastic saddles for grey/beige 32mm HDPE pipe, secured with clouts or bandit straps)

  • 39.018 20mm or 32mm conduit secured to pole, spacing < 1.5m (concrete bandit tape)

41.000 BDD Terminal

  • 41.001 Pit lids secure/locked, with bung fitted where appropriate

42.000 Pedestal

  • 42.002 Correct size pedestal used

  • 42.003 Lid secure

  • 42.004 PDS network labelled correctly (when housing a copper loop or other MDF customer feed)

  • 42.008 Foam bung fitted/in correct position

  • 42.011 Service lead labelled with customer's address

  • 42.015 Micro duct sheath opening 50mm above bung

  • 42.024 Pedestal straight and secure

  • 42.026 Micro duct connectors installed in vertical positions only

43.000 Aerial service lead

  • 43.001 Correct service lead used

  • 43.002 No in span joints (single Ribbonet aerial)

  • 43.003 Tension and sag correct

  • 43.004 Correct pole fittings used and installed correctly (screw eyes, clamps)

  • 43.006 White pipes down poles

  • 43.007 600mm saddle spacing (wooden poles) or 1500mm bandit spacing (concrete poles)

  • 43.008 Roadway crossing min 5.5m height, elsewhere 4.9m height

  • 43.012 Correct building fittings used and installed correctly (screw eyes, clamps)

  • 43.016 Aerial lead managed on pole from termination to termination

  • 43.017 Hybrid nanotube aerial 1 x turn every 10m

  • 43.020 Pillar is cut 30mm above the ground

  • 43.021 50/32 adaptor glued inside the pillar

  • 43.022 3 wafer screws used to secure the pillar to the adaptor

  • 43.024 CT installed at the top and labelled

  • 43.025 Pillar has been removed

44.000 Service lead

  • 44.001 Service lead terminated and labelled at terminal correctly

  • 44.002 20mm pipe connected at pedestal correctly (bend into pedestal)

  • 44.003 20mm pipe connected at BDD correctly (50mm into BDD pit, at 450mm deep)

  • 44.007 Green 20mm installed in trench

  • 44.008 White pipe above ground level

  • 44.009 Depth correct

  • 44.017 Both ends of the Ribbonet correctly sealed during the lead in process

  • 44.018 Decision tree applied for correct lead in method

  • 44.019 Correct surface mount fastenings used/spacing to suit surface. Spacing max 600mm supported, 300mm unsupported

  • 44.020 Copper locate installed with fixed fibre lead in if not installed with existing copper

45.000 ETP

  • 45.001 ETP physical alignment correct, all fittings secure, installation tidy

  • 45.005 20mm pipe to ETP white or grey only (not green)

  • 45.017 Ericsson 5/NEG203200 ETP installed

  • 45.018 ETP installed between 300mm and 1500mm above ground, secured with three screws, and installed to best suit the site and external cladding

  • 45.021 White pipe or flexi duct fitted to building secured with galvanised or stainless saddles and fittings

  • 45.022 50-20mm duct reducer fitted between 50mm underground green duct and 20mm above ground white pipe

  • 45.023 Fixed fibre or ANF tube housed in 20mm white or grey pipe or UV stabilised flexi pipe where fibre exits through bottom of ETP

  • 45.024 Correctly connected to hybrid cable at ETP

  • 45.025 Locate element correctly managed

  • 45.026 30mm bend radius unconditionally observed at all locations

  • 45.028 Heat shrink splice protectors secured from movement

  • 45.029 Fibre continuity confirmed

  • 45.030 No fibre or task waste, all optical (glass) ends safely contained

  • 45.031 Gas block connector installed on the micro duct and locked

  • 45.032 Sufficient metallic location element left for locate purposes

  • 45.033 DB - green sheath open 20mm above entry position, black sheath 25mm above the green

  • 45.034 Micro duct held in position with zip tie or integrated saddle within ETP

  • 45.035 Laser label positioned externally on the lid, supplied screw installed in bottom or front of ETP

  • 45.036 Cable entry to building sealed

  • 45.037 Unused copper pairs are capped with clearing connectors

  • 45.038 Hybrid cable/pigtail enters ETP at correct position

  • 45.039 Fibre managed correctly, length not excessive or causing unnecessary bends or stress

  • 45.040 Min 5mm hybrid cable sheath inside ETP

  • 45.042 320mm nano duct and 320mm copper filed in ETP

46.000 Customer premises

  • 46.001.Correct cable used (cat 5 minimum - star wiring)

  • 46.003 Correct clearances observed

  • 46.004 Wiring route acceptable and cable safe and secure

  • 46.006 Exposed surface wiring neat and tidy

  • 46.007 Jack point hardware installed correctly

  • 46,008 Jack points not installed in damp areas

  • 46.009 Jack points at least 300mm above floor

  • 46.014 Contractor appearance/manner/service completion card left (customer view)

  • 46.016 Optical power meter test at the ONT prior to plugging in the SC/A connector

  • 46.017 Fibre/copper hybrid cable used

  • 46.018 No fibre task waste on site, all optical(glass) ends safely contained

  • 46.019 Connectors cleaned and verified with fibre inspection probe

  • 46.020 ONT/RGW installed and secured correctly, at least 300mm above floor

  • 46.021 ONT/RGW not installed in a damp areas

  • 46.022 Cables in ceiling cavity and under floors secured with cable clips (saddles) or cable pin clips

  • 46.023 Internal cabling secure including pigtail from ONT to RGW

  • 46.025 Min 10mm hybrid sable sheath inside ONT

  • 46.026 ITP installed on hybrid copper cable at ONT

  • 46.027 RJ45 ITP labelled with 'voice to ETP'

  • 46.028 RJ45 ITP Vodafone RED BOOK label 'voice'

  • 46.029 ONT - 2 or more labelled with SLID number

  • 46.031 Dual RJ45,installed and labelled 'service lead' and 'home wiring' (Spark)

47.000 Business premises

  • 47.006 Connectors cleaned and verified with fibre inspection probe

  • 47.007 No fibre or task waste, all optical (glass) ends safely contained

  • 47.008 All ONTs labelled with SLID number - schools, commercial, locations with multiple services

49.000 Sales and service advice note

  • 49.001 Completion date and time filled in

  • 49.002 Service order number correct

  • 49.003 Customer details correct

  • 49.004 Service required details correct

  • 49.005 Additional services provided are clearly recorded

  • 49.006 Customer acknowledged with name and signature (or reason for no customer signature included)

  • 49.007 Service order type correct

  • 49.009 Service person name recorded

  • 49.010 Correct billing codes claimed

  • 49.011 Phone/circuit number correct

  • 49.012 CSA correct

  • 49.013 Network elements where work was carried out are recorded

  • 49.015 Location recorded where services provided

68.000 Fibre Access terminal

  • 68.001 Entry tubes sealed

  • 68.003 Lead cleaned and abraded

  • 68.004 Rayblocks fitted to tubes (90mm) and shrunk down to seal cable into the access tube, glue extruding

  • 68.005 Tube holder installed

  • 68.007 Silica gel pack installed/replaced

  • 68.008 Triangle symbols on the dome and base match

  • 68.009 All latches are closed

  • 68.010 O-ring installed

  • 68.011 Fibre correctly managed within FAT and trays

  • 68.013 Slack managed in fibre management coil (1.5 - 2m)

  • 68.014 Swing arm and bracket in working order/or mounted on manufacturers bracket

  • 68.015 Lid locked and lock bung installed

  • 68.016 30mm bend radius unconditionally observed at all locations

  • 68.018 Heat shrink splice protectors secured from movement

  • 68.019 No fibre task waste, all optical (glass) ends safely contained

  • 68.026 Tray labelled with cabinet, fibres and customer's address

  • 68.027 Gel sealed fully tightened

  • 68.028 Customer 'lead in' felt tape 5mm from end - secured to bracket, 2 cable ties

69.000 Blown fibre boundary connection

  • 69.001 1-way tubes trimmed accurately and securely seated in 5mm connector

  • 69.002 1-way Ribbonet connector secure

  • 69.003 Cover board prior to reinstatement

72.000 Reinstatement

  • 72.001 Property damage made good

  • 72.002 Ground reinstatement completed around poles

  • 72.003 Reinstatement/backfill satisfactory around buried service lead

  • 72.007 Excess vegetation removed

  • 72.008 Reinstatement complete around pedestal

  • 72.009 Reinstatement complete around hand hole

  • 72.018 Ground reinstatement completed

73.000 Site tidy

  • 73.001 Site tidy, no task waste - poles

  • 73.002 Site tidy, no task waste - cabinet internal

  • 73.005 Site tidy, no task waste - BDD terminal

  • 73.006 Site tidy, no task waste - PDS terminal

  • 73.007 Site tidy, no task waste - Aerial service lead

  • 73.008 Site tidy, no task waste - Buried service lead

  • 73.009 Site tidy, no task waste - ETP

  • 73.010 Site tidy, no task waste - Customer premises

  • 73.011 Site tidy, no task waste - Business premises

  • 73.012 Site tidy, no task waste - Cabinet external

  • 73.013 Site tidy, no task waste - Hand holes

  • 73.015 Site tidy, no task waste - GLC

  • 73.016 Site tidy, no task waste - Channell pit

74.000 Hand holes

  • 74.001 Bedding done correctly and compacted

  • 74.002 Lock facing the customer's boundary and openable

  • 74.006 Lateral labelled and sealed, end cap and heat shrink

  • 74.007 Hand holes locked

  • 74.012 1-way tubes securely seated in 5mm connector

  • 74.013 Customer's s/way duct managed round edge of hand hole

  • 74.014 30mm bend radius unconditionally observed at all locations

  • 74.016 Correct join between lateral and service lead

75.000 Ground level closure

  • 75.002 Lid secure

  • 75.003 Lid labelled

  • 75.004 Micro ducts labelled

  • 75.015 All micro ducts secured into management brackets

  • 75.019 30mm bending radius unconditionally observed at all locations

  • 75.021 Laser label positioned externally on lid

  • 75.022 EPFU routed correctly to tray

  • 75.023 Fibre splice secured in tray holder

  • 75.024 EPFU from port 2 routed around organiser to tray, secured with Velcro

  • 75.025 Tray labelled with micro duct number, address and distance to customer's site

  • 75.026 Correct join between lateral and service lead

77.000 UFB Channell flash 9 installation

  • 77.009 S/s locking collar secured with locking bolt

  • 77.010 Closure ID label facing upwards

  • 77.013 All spare 5mm and 12mm micro ducts capped with ducts and caps

  • 77.014 All 52x5mm micro ducts capped with duct end caps

  • 77.017 Closure base 'O-ring' clean, dry, undamaged and correctly seated

  • 77.018 Spare O-ring in PE bag inside closure

  • 77.028 SC trays labelled on underside of tray with micro duct number, splitter and splitter leg number, address and distance to customer's site

  • 77.059 No fibre task waste, all optical (glass) ends safely contained

78.000 Building distributor

  • 78.056 Drop cable installed in the next available port in the wraparound seal

  • 78.057 Cable sheath stripped back to the correct length

  • 78.058 Foam tape is at end of the sheath opening and secured with a steel tipped zip tie

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.