Job ID
-
Job Source
-
Address
-
Audit date
-
Auditor
-
Auditee
2.000 Handover & collateral delivered to Chorus
-
2.011 Inventory database updated
4.000 Code
-
4.004 Correct Statement of works codes used
6.000 Work areas and safety
-
6.001 Personal and site safety procedures observed
-
6.002 Hazards identified and recorded - worksite audit form completed, hazard notices in place
-
6.003 TMP provided
-
6.004 Services located
-
6.005 Power and gas clearances correct
-
6.006 Gas detector- within current calibration certificate
-
6.007 Gas detector - measures for oxygen, flammable,carbon monoxide (and hydrogen sulphide in volcanic areas)
-
6.008 Network security correct (exchange)
-
6.009 Joint chamber/manhole lids closed and secure
-
6.012 Temporary work clearly labelled and contains name, contact details, job ID of person involved
-
6.014 Any defects to existing network outside of scope of project referred to be rectified in the future
11.000 OFDF & exchange fibre
-
11.002 OFDF hardware secure, OFDF drawer, cable tough, guides, rack
-
11.003 Network labelling correct at OFDF (OFDF designation, jumper to/from label, data card in I, Q and L drawers)
-
11.004 Optical cables and cords adequately managed within racks and shelves
-
11.007 30mm bend radius unconditionally observed at all locations
-
11.010 Protective caps on all unterminated connectors
-
11.011 Connectors cleaned and verified with fibre inspection probe
-
11.012 Laser safety labels (1M safety) at OFDF (inside and front panel)
-
11.013 No fibre task waste, all optical (glass) ends safety contained
-
11.014 Access OFDF patch cords routed within mandrels. Excess length stored at AOFDF end
-
11.015 Access OFDF passive devices within OCM shelf, all unused ports capped
-
11.021 Log completed
-
11.023 OCM shelf data card filled out correctly with drawer ID and fibre number
25.000 Poles
-
25.010 Pole safe to climb (hammer, probe,dig)
-
25.012 Plant positioned correctly and safely, plant clearances correct
-
25.014 Unsafe poles labelled/marked for replacement/7 days
-
25.016 Deeded poles shown in NetMAP pole editor
-
25.017 All tagged poles in NetMAP
38.000 UFB fibre flexibility point (FFP)
-
38.006 Distribution frame: data card inside of drawer
-
38.017 All unused connectors capped
-
38.027 Managed via mandrels/Velcro ties used
-
38.029 No fibre or task waste, all optical (glass) ends safely contained
-
38.030 Data card complete in pencil. ABF - micro duct number, splitter ID and splitter leg. FF - Splitter ID and splitter leg
-
38.033 Allocated tube used - EPFU routed correctly, from allocated tube, over mandrel or via UMS backing board to correct tray position
-
38.034 Fibre secured in tube with strain bung
-
38.035 Allocated splitter leg identified and routed over mandrel or via UMS backing board into correct tray position
-
38.036 FIP both LC connectors prior to connection
-
38.037 Minimum bend radius maintained when drawers opened or closed
39.000 Aerial terminal/OFDC
-
39.004 Terminal lid secure
-
39.006 Lead-in entry correct
-
39.013 Network labelling in place to suit requirments
-
39.015 Flexi pipe secured directly below terminal (galv saddle on wooden poles)
-
39.017 20mm or 32mm conduit secured to pole (wooden - galv saddles for white PVC pipe, plastic saddles for grey/beige 32mm HDPE pipe, secured with clouts or bandit straps)
-
39.018 20mm or 32mm conduit secured to pole, spacing < 1.5m (concrete bandit tape)
41.000 BDD Terminal
-
41.001 Pit lids secure/locked, with bung fitted where appropriate
42.000 Pedestal
-
42.002 Correct size pedestal used
-
42.003 Lid secure
-
42.004 PDS network labelled correctly (when housing a copper loop or other MDF customer feed)
-
42.008 Foam bung fitted/in correct position
-
42.011 Service lead labelled with customer's address
-
42.015 Micro duct sheath opening 50mm above bung
-
42.024 Pedestal straight and secure
-
42.026 Micro duct connectors installed in vertical positions only
43.000 Aerial service lead
-
43.001 Correct service lead used
-
43.002 No in span joints (single Ribbonet aerial)
-
43.003 Tension and sag correct
-
43.004 Correct pole fittings used and installed correctly (screw eyes, clamps)
-
43.006 White pipes down poles
-
43.007 600mm saddle spacing (wooden poles) or 1500mm bandit spacing (concrete poles)
-
43.008 Roadway crossing min 5.5m height, elsewhere 4.9m height
-
43.012 Correct building fittings used and installed correctly (screw eyes, clamps)
-
43.016 Aerial lead managed on pole from termination to termination
-
43.017 Hybrid nanotube aerial 1 x turn every 10m
-
43.020 Pillar is cut 30mm above the ground
-
43.021 50/32 adaptor glued inside the pillar
-
43.022 3 wafer screws used to secure the pillar to the adaptor
-
43.024 CT installed at the top and labelled
-
43.025 Pillar has been removed
44.000 Service lead
-
44.001 Service lead terminated and labelled at terminal correctly
-
44.002 20mm pipe connected at pedestal correctly (bend into pedestal)
-
44.003 20mm pipe connected at BDD correctly (50mm into BDD pit, at 450mm deep)
-
44.007 Green 20mm installed in trench
-
44.008 White pipe above ground level
-
44.009 Depth correct
-
44.017 Both ends of the Ribbonet correctly sealed during the lead in process
-
44.018 Decision tree applied for correct lead in method
-
44.019 Correct surface mount fastenings used/spacing to suit surface. Spacing max 600mm supported, 300mm unsupported
-
44.020 Copper locate installed with fixed fibre lead in if not installed with existing copper
45.000 ETP
-
45.001 ETP physical alignment correct, all fittings secure, installation tidy
-
45.005 20mm pipe to ETP white or grey only (not green)
-
45.017 Ericsson 5/NEG203200 ETP installed
-
45.018 ETP installed between 300mm and 1500mm above ground, secured with three screws, and installed to best suit the site and external cladding
-
45.021 White pipe or flexi duct fitted to building secured with galvanised or stainless saddles and fittings
-
45.022 50-20mm duct reducer fitted between 50mm underground green duct and 20mm above ground white pipe
-
45.023 Fixed fibre or ANF tube housed in 20mm white or grey pipe or UV stabilised flexi pipe where fibre exits through bottom of ETP
-
45.024 Correctly connected to hybrid cable at ETP
-
45.025 Locate element correctly managed
-
45.026 30mm bend radius unconditionally observed at all locations
-
45.028 Heat shrink splice protectors secured from movement
-
45.029 Fibre continuity confirmed
-
45.030 No fibre or task waste, all optical (glass) ends safely contained
-
45.031 Gas block connector installed on the micro duct and locked
-
45.032 Sufficient metallic location element left for locate purposes
-
45.033 DB - green sheath open 20mm above entry position, black sheath 25mm above the green
-
45.034 Micro duct held in position with zip tie or integrated saddle within ETP
-
45.035 Laser label positioned externally on the lid, supplied screw installed in bottom or front of ETP
-
45.036 Cable entry to building sealed
-
45.037 Unused copper pairs are capped with clearing connectors
-
45.038 Hybrid cable/pigtail enters ETP at correct position
-
45.039 Fibre managed correctly, length not excessive or causing unnecessary bends or stress
-
45.040 Min 5mm hybrid cable sheath inside ETP
-
45.042 320mm nano duct and 320mm copper filed in ETP
46.000 Customer premises
-
46.001.Correct cable used (cat 5 minimum - star wiring)
-
46.003 Correct clearances observed
-
46.004 Wiring route acceptable and cable safe and secure
-
46.006 Exposed surface wiring neat and tidy
-
46.007 Jack point hardware installed correctly
-
46,008 Jack points not installed in damp areas
-
46.009 Jack points at least 300mm above floor
-
46.014 Contractor appearance/manner/service completion card left (customer view)
-
46.016 Optical power meter test at the ONT prior to plugging in the SC/A connector
-
46.017 Fibre/copper hybrid cable used
-
46.018 No fibre task waste on site, all optical(glass) ends safely contained
-
46.019 Connectors cleaned and verified with fibre inspection probe
-
46.020 ONT/RGW installed and secured correctly, at least 300mm above floor
-
46.021 ONT/RGW not installed in a damp areas
-
46.022 Cables in ceiling cavity and under floors secured with cable clips (saddles) or cable pin clips
-
46.023 Internal cabling secure including pigtail from ONT to RGW
-
46.025 Min 10mm hybrid sable sheath inside ONT
-
46.026 ITP installed on hybrid copper cable at ONT
-
46.027 RJ45 ITP labelled with 'voice to ETP'
-
46.028 RJ45 ITP Vodafone RED BOOK label 'voice'
-
46.029 ONT - 2 or more labelled with SLID number
-
46.031 Dual RJ45,installed and labelled 'service lead' and 'home wiring' (Spark)
47.000 Business premises
-
47.006 Connectors cleaned and verified with fibre inspection probe
-
47.007 No fibre or task waste, all optical (glass) ends safely contained
-
47.008 All ONTs labelled with SLID number - schools, commercial, locations with multiple services
49.000 Sales and service advice note
-
49.001 Completion date and time filled in
-
49.002 Service order number correct
-
49.003 Customer details correct
-
49.004 Service required details correct
-
49.005 Additional services provided are clearly recorded
-
49.006 Customer acknowledged with name and signature (or reason for no customer signature included)
-
49.007 Service order type correct
-
49.009 Service person name recorded
-
49.010 Correct billing codes claimed
-
49.011 Phone/circuit number correct
-
49.012 CSA correct
-
49.013 Network elements where work was carried out are recorded
-
49.015 Location recorded where services provided
68.000 Fibre Access terminal
-
68.001 Entry tubes sealed
-
68.003 Lead cleaned and abraded
-
68.004 Rayblocks fitted to tubes (90mm) and shrunk down to seal cable into the access tube, glue extruding
-
68.005 Tube holder installed
-
68.007 Silica gel pack installed/replaced
-
68.008 Triangle symbols on the dome and base match
-
68.009 All latches are closed
-
68.010 O-ring installed
-
68.011 Fibre correctly managed within FAT and trays
-
68.013 Slack managed in fibre management coil (1.5 - 2m)
-
68.014 Swing arm and bracket in working order/or mounted on manufacturers bracket
-
68.015 Lid locked and lock bung installed
-
68.016 30mm bend radius unconditionally observed at all locations
-
68.018 Heat shrink splice protectors secured from movement
-
68.019 No fibre task waste, all optical (glass) ends safely contained
-
68.026 Tray labelled with cabinet, fibres and customer's address
-
68.027 Gel sealed fully tightened
-
68.028 Customer 'lead in' felt tape 5mm from end - secured to bracket, 2 cable ties
69.000 Blown fibre boundary connection
-
69.001 1-way tubes trimmed accurately and securely seated in 5mm connector
-
69.002 1-way Ribbonet connector secure
-
69.003 Cover board prior to reinstatement
72.000 Reinstatement
-
72.001 Property damage made good
-
72.002 Ground reinstatement completed around poles
-
72.003 Reinstatement/backfill satisfactory around buried service lead
-
72.007 Excess vegetation removed
-
72.008 Reinstatement complete around pedestal
-
72.009 Reinstatement complete around hand hole
-
72.018 Ground reinstatement completed
73.000 Site tidy
-
73.001 Site tidy, no task waste - poles
-
73.002 Site tidy, no task waste - cabinet internal
-
73.005 Site tidy, no task waste - BDD terminal
-
73.006 Site tidy, no task waste - PDS terminal
-
73.007 Site tidy, no task waste - Aerial service lead
-
73.008 Site tidy, no task waste - Buried service lead
-
73.009 Site tidy, no task waste - ETP
-
73.010 Site tidy, no task waste - Customer premises
-
73.011 Site tidy, no task waste - Business premises
-
73.012 Site tidy, no task waste - Cabinet external
-
73.013 Site tidy, no task waste - Hand holes
-
73.015 Site tidy, no task waste - GLC
-
73.016 Site tidy, no task waste - Channell pit
74.000 Hand holes
-
74.001 Bedding done correctly and compacted
-
74.002 Lock facing the customer's boundary and openable
-
74.006 Lateral labelled and sealed, end cap and heat shrink
-
74.007 Hand holes locked
-
74.012 1-way tubes securely seated in 5mm connector
-
74.013 Customer's s/way duct managed round edge of hand hole
-
74.014 30mm bend radius unconditionally observed at all locations
-
74.016 Correct join between lateral and service lead
75.000 Ground level closure
-
75.002 Lid secure
-
75.003 Lid labelled
-
75.004 Micro ducts labelled
-
75.015 All micro ducts secured into management brackets
-
75.019 30mm bending radius unconditionally observed at all locations
-
75.021 Laser label positioned externally on lid
-
75.022 EPFU routed correctly to tray
-
75.023 Fibre splice secured in tray holder
-
75.024 EPFU from port 2 routed around organiser to tray, secured with Velcro
-
75.025 Tray labelled with micro duct number, address and distance to customer's site
-
75.026 Correct join between lateral and service lead
77.000 UFB Channell flash 9 installation
-
77.009 S/s locking collar secured with locking bolt
-
77.010 Closure ID label facing upwards
-
77.013 All spare 5mm and 12mm micro ducts capped with ducts and caps
-
77.014 All 52x5mm micro ducts capped with duct end caps
-
77.017 Closure base 'O-ring' clean, dry, undamaged and correctly seated
-
77.018 Spare O-ring in PE bag inside closure
-
77.028 SC trays labelled on underside of tray with micro duct number, splitter and splitter leg number, address and distance to customer's site
-
77.059 No fibre task waste, all optical (glass) ends safely contained
78.000 Building distributor
-
78.056 Drop cable installed in the next available port in the wraparound seal
-
78.057 Cable sheath stripped back to the correct length
-
78.058 Foam tape is at end of the sheath opening and secured with a steel tipped zip tie