Title Page
-
Site name:
-
Site Number:
-
Conducted on
-
Prepared by
-
Location
-
How many VX820 Ped's are you installing?
-
Which VX680's are staying on site? PTID's and MAC addresses required.
VX820 install. Turn off VX680 before install as you will be using the same IP address.
-
What is the key number for the lock of the PED Pole
-
VX820 PTID number
-
VX820 Serial Number
-
De-installed VX680 PTID
-
De-installed VX680 Serial Number
-
De-installed VX680 Mac Address
-
Condition of PED
-
De-installed VX680 Charging Cradle.
-
Photo of finished install VX820. All PED's need to be on "READY" screen
-
Picture of PED tested End to End. Picture of Receipts for transaction and refund.
-
Picture of Data Points/Connections/Power
-
Perspective view of Tills and VX820
-
Some Sites may need more than the one new EPOS Switch
-
How many NEW PDQ Switches were installed?
-
Which Ports where used on NEW PED switch? Port1 should be PED 1 or 1st PED in sequence of number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
-
Take Picture of the new Switch(es) in the comms cab.
Sign off
-
Have the new VX820 been tested end to end?
-
Please go back and test transactions end to end and take photo of receipt.
-
Any issues that require Stonegates attention?
-
What issues are occurred while on site?
-
Are you taking the old PED's with you or Celestra collecting?
-
Take photo of where box is stored with Label facing up.
-
Engineer Sign Off.
-
Manager Sign off.