Title Page

  • Site conducted

  • Site name:

  • Site Number:

  • Conducted on

  • Prepared by

  • Location
  • undefined

  • How many VX820 Ped's are you installing?

  • Which VX680's are staying on site? PTID's and MAC addresses required.

  • VX820 install. Turn off VX680 before install as you will be using the same IP address.
  • PED no.

  • VX820 PTID number

  • VX820 Serial Number

  • De-installed VX680 PTID

  • De-installed VX680 Serial Number

  • Condition of PED

  • Photo of finished install VX820. All PED's need to be on "READY" screen

  • Picture of PED tested End to End. Picture of Receipts for transaction and refund.

  • Picture of Data Points/Connections/Power

  • Some Sites may need more than the one new EPOS Switch

  • How many NEW PDQ Switches were installed?

  • Take Picture of the new Switch(es) in the comms cab.

Sign off

  • Have the new VX820 been tested end to end?

  • Please go back and test transactions end to end and take photo of receipt.

  • Any issues that require Stonegates attention?

  • What issues are occurred while on site?

  • Are you taking the old PED's with you or Celestra collecting?

  • Take photo of where box is stored with Label facing up.

  • Engineer Sign Off.

  • Manager Sign off.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.