Information

  • Document No.

  • Site Inspected

  • Conducted on

  • Audited by

LItter Removal and Sweeping

  • Is there litter or sweeping to audit at this site?

  • Is the park free of accummulated loose litter? (< 2 cubic meters)

Litter Removal

  • Is the park free of large debris (>2 cubic meters)

  • Is the park free of advertising/signage such as stickers, posters, real estate advertising and commercial displays?

  • Was the park been cleared of loose litter prior to mowing operations taking place?

Sweeping

  • All paths and hard surfaces are to be swept clear of litter and organic matter such as bark, grass clippings, mulch, leaves etc. Spilled bark is to be returned to the playground and mulch to the garden.

    Sweeping of kerb and channels is to be carried out between four and six weeks following weed spraying (to be undertaken in September, December and March) of kerb and channels.

    Sweeping shall be carried out following any mowing of a scheduled area to remove any clippings from carparks, driveways, kerb and channel, and all hard surfaces.

  • Are all hard surfaces and paved areas free of accummulated organic material and litter?

  • Are all carparks, kerb & channel and driveways free of accumulated organic material and litter?

  • Is the kerb and channel free of weeds?

Turf Maintenance

  • Is there turf to audit at this site?

General Requirements

  • Has spillage of clippings into garden beds and adjacent structures been kept to a minimum?

  • Are clippings evenly distributed over turf areas without clumping or windrows?

  • Has stalk growth or flower/seed heads been removed at the time of cutting?

  • Are trees, fences, structure, signs and park furniture free from recent damage caused by mower operations?

  • Has a vegetation-free circle of 500mm from trees and tree surface roots been maintained?

  • Have edges been maintained to same frequency/ height as adjacent turf?

  • Are hard surfaces free of encroachment of grass? (maximum is 50mm)

  • Has the adjacent berm or road verge been maintained to the same standard as the park?

  • Is the turf free of damage to the surface such as rutts/holes/scuffing caused by mowing operations?

Mowing Heights

  • What grades of mowing are present on site?

  • Has mechanical edging been used? (Chemical edge control is not permitted)

  • Has a catcher been used so that turf is free of arisings?

  • Have clippings been removed from site?

  • Is the grass height within the specified range?

Gardens

Garden Grades

  • What grades of garden are present on site?

Annual Beds (GA1)

  • Is the garden bed 100% free of weeds?

  • Are the plants free of damage, pests and disease with vigorous growth?

  • Is the garden bed full? (no gaps in planting)

  • Is the garden bed free of rogue plants?

  • Have plants been dead-headed to accepted horticultural practice and site left tidy?

  • Is the garden free of accumulated loose litter?

Perennial Plantings (GA2)

  • Is the garden free of weeds exceeding 75mm in height or spread?

  • Are the beds more than 95% weed free?

  • Is the garden bed full? (no gaps in planting)

  • Are the plants free of damage, pests and disease with vigorous growth?

  • Have plants been dead-headed to accepted horticultural practice and site left tidy?

  • Is there a minimum of 75mm mulch cover on previously mulched areas?

  • Has all spilled mulch been returned to garden beds?

  • Has vegetation been cut back to 300mm behind a hard edge from footpaths, roads, kerbs and other paved areas?

  • Is the garden free of accumulated loose litter?

Rosebeds (GA3)

  • Is the garden bed 95% free of weeds?

  • Is the garden free of weeds exceeding 75mm in height or spread?

  • Is there a minimum of 75mm mulch cover on previously mulched areas?

  • Has all spilled mulch been returned to garden beds?

  • Are the plants free of damage, pests and disease with vigorous growth?

  • Have plants been dead-headed to accepted horticultural practice and site left tidy?

  • Has vegetation been cut back to 300mm behind a hard edge from footpaths, roads, kerbs and other paved areas?

  • Is the garden free of accumulated loose litter?

Shrub Gardens (GA4)

  • Is the garden bed 95% free of weeds?

  • Is the garden free of weeds exceeding 75mm in height or spread?

  • Are the plants free of damage, pests and disease with vigorous growth?

  • Has all spilled mulch been returned to garden beds?

  • Has vegetation been cut back to 300mm behind a hard edge from footpaths, roads, kerbs and other paved areas?

  • Have plants been pruned to accepted horticultural practice to promote health and vigour and site left tidy?

  • Has excessive leaf fall been removed?

  • Is the garden free of accumulated loose litter?

Hedges

  • Have scheduled hedges been cut evenly with straight top and sides to a height of 2m from mean ground level?

Revegetation Areas (GA5)

  • Has all spilled mulch been returned to garden beds?

  • Are the plants free of damage, pests and disease with vigorous growth?

  • Has vegetation been cut back to 300mm behind a hard edge from footpaths, roads, kerbs and other paved areas?

Juvenile Trees

  • Has 75mm of mulch been maintained in a 500mm radius of the tree?

  • Are the tree mulch circles free of weeds?

  • Are the trees staked and tied appropriately?

Cemeteries

  • Are there cemeteries present on this site?

  • Is the cemetery free of graffiti?

  • Are fallen or broken headstones laid on top of correct grave?

  • Is the lawn grass height within the specified range of 25mm - 75mm?

  • Are all other grass areas mown to within a height of 150mm or less?

  • Have dead floral tributes been removed (no earlier than 21 days after funeral)

  • Are recent graves level and have they been suitably resown/turfed within 28 days of burial?

  • Where new graves have been dug, is the cemetery free from damage to adjacent plots and left in tidy condition?

  • Is the cemetery free from unattended open holes?

Please proceed to next section

Walkways

  • Are there walkways present on this site?

  • Is the walkway free of hazards?

  • Is the walkway free of obstructions?

  • Is the walkway free of accumulated litter?

  • Is the walkway surface free of excessive weeds?

  • Is the walkway surface free of mud?

Please proceed to next section

Health and Safety

Health and Safety

  • Was the contractor working on site during the audit?

  • Were guards correctly fitted to machinery to prevent injury to the operator or public?

  • Were staff wearing appropriate protective clothing and equipment?

  • Was the contractor working on or adjacent to the road?

  • Were appropriate traffic management measures in place in accordance with the TMP?

  • Was the vehicle or machine fitted with an operational amber flashing light?

Summary

  • Overall, how is the presentation of the site?

  • Additional notes/comments

  • List actions for contractor

  • Additional Photos

  • Sketch notes

Authorisation

  • Inspected on behalf of the Engineer to the Contract

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.