Audit

Indoor pool plant room

Indoor pool plant room inspection to be completed?

Chemical dosing controllers on and no faults?

Circulation pump on?

Heating pumps on?

Boiler(s) on?

Balance tank level?

Check pumps, pipe work, filters and storage tanks for leaks

Sand filter differential pressure

Variable speed drive functional?

Outdoor pool plant room

Outdoor pool plant room inspection to be completed?

Chemical dosing controllers on and no faults?

Circulation pump on?

Heating pump on?

Boiler on?

Balance tank level?

Check pumps, pipe work, filters and storage tanks for leaks

Flow rate

Variable speed drive functional?

Spa pool plant room

Spa pool plant room inspection to be completed?

Chemical dosing controllers on and no faults?

Circulation pump(s) on?

Boiler on?

Check pumps, pipe work, filters and storage tanks for leaks

Co-gen plant

Co-gen checklist completed?

Inspection sign-off
Duty manager signature

Please email to glen.hepper@ymca.org.au

Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.