Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Set out to completion unit checklist
-
ITP
Room
-
Unit Room
-
Level
-
Subframe installed, all fixings and ends of sub sill completely sealed and waterproof
-
Set out as per latest updated plans and shop drawings
-
Cover plates are installed damage free internal and external
-
Subframe completely sealed around perimeter on the inside
-
Ensure doors/windows are operating and locking correctly
-
Windows lifted into subframe and fixed in position, jamb closer installed
-
Complete caulking on the external of all windows
-
Remove trade waste from unit and lock doors
-
All items above have been completed