Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Set out to completion unit checklist

  • ITP

  • Room
  • Unit Room

  • Level

  • Subframe installed, all fixings and ends of sub sill completely sealed and waterproof

  • Set out as per latest updated plans and shop drawings

  • Cover plates are installed damage free internal and external

  • Subframe completely sealed around perimeter on the inside

  • Ensure doors/windows are operating and locking correctly

  • Windows lifted into subframe and fixed in position, jamb closer installed

  • Complete caulking on the external of all windows

  • Remove trade waste from unit and lock doors

  • All items above have been completed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.